Top-rated pole barn builders.

Get matched with top pole barn builders in Gilbert, SC

Enter your zip and get matched with up to 5 pros

Need a pro for your pole barn building project in Gilbert, SC?

Select your specific project to find the pro for you.

TRUSTED BY GILBERT, SC HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon71
    Verified pole barn building services reviews

Find Pole barn builders in Gilbert

Avatar for Handyman Bob LLC
Handyman Bob LLC
4.6(
11
)
Shed, Barn or Playhouse - Build

Serving Gilbert, SC and surrounding areas

Approved

Super Service Award Winner

Free estimates

Emergency services offered

Credit card accepted

"Bob and his crew were amazing, understanding, and asked me through every step of the process! Got an extra room/Frog built above garage. Great build and Quality work! Would recommend for future jobs!"
Landscaping Project
Landscaping Project
Landscaping Project
Additional Photos
Additional Photos

+7

8 neighbors recently requested a quote
Recommended by88%of homeowners
Avatar for Lakeside Construction of Columbia LLC
Lakeside Construction of Columbia LLC
4.8(
161
)
Shed, Barn or Playhouse - BuildShed, Barn or Playhouse - Repair

Serving Gilbert, SC and surrounding areas

In business since 2010

Free estimates

Credit card accepted

"I was very pleased with the supervision of the Project Manager. He met me on-site to answer questions and made recommendations based on what I needed. He was on-site during the removal and installation process making several trips to secure insulation and plywood decking which they found missing on the structure once the existing roof was removed. Tom stayed in touch with me via text, phone or in person throughout the process. The owner came out on the final day to inspect the work and meet with me. He was also present during the actual work. I was also pleased that the crew was polite and efficient with their work and clean-up. I received my warranty in the mail the following week."
Recommended by97%of homeowners
Avatar for Apex Construction
Apex Construction
5.0(
11
)
Shed, Barn or Playhouse - Build

Serving Gilbert, SC and surrounding areas

In business since 1997

"I worked with Apex Construction for both the design and construction of my renovations project. We converted our pole building into a mother-in-law suite. It turned out even better than I expected. It can be difficult finding people whose quality and integrity you can trust at a fair price. I will definitely use Apex again and again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+3

Recommended by100%of homeowners
...
Showing 1-10 of 106
Pole Barn Builders questions, answered by experts

Common pitfalls include underestimating the cost of site preparation, overlooking permit and utility fees, and not setting aside funds for unexpected changes. Change orders during construction can disrupt your budget. It’s best to plan a detailed budget, obtain multiple quotes, and include a 10% to 15% contingency fund for unexpected expenses.

Pole barns and carports are similar in that they rely on posts for support and are often not connected to a primary structure. The main difference between the two is that pole barns usually include walls that surround the entire perimeter of the structure, while carports generally remain open on three or four sides. It’s possible to insulate garage doors and even exterior walls on pole barns to create a comfortable workspace, and it’s a bit more secure for storage purposes. However, carports are more affordable.

Your chicken coop needs to be off the ground to protect your chickens and avoid problems brought on by flooding, mud, and moisture. If you can't locate a high area to build the coop, you should build an elevated coop to ensure it stays dry. 

The timeline to build your barn will depend on the barn type and the company you hire. A pole barn may take six weeks or so, while a traditionally framed or steel-framed barn can take four months or longer. Building a barndominium takes the longest because you are essentially building a new home. You can expect barndominiums to take six months or longer to build.

The steep slope of an A-frame roof withstands high winds, heavy rain, and heavy snowfall, making them popular all over the world. A-frames also offer simple, quick construction. Finally, an A-frame typically has large windows on the non-roof sides to let in a maximum amount of natural light. Consequently, they are often an affordable building solution for the right homeowner and location.

The Gilbert, SC homeowners’ guide to pole barn building services

From average costs to expert advice, get all the answers you need to get your job done.

  • Farm blue barn shed and gravel driveway.

    If you’ve ever wondered what precisely a pole barn is, you’re about to find out. Not many know the advantages and disadvantages to the cost, construction style, and flexibility of building one on your own or hiring a contractor for the job.

  • framework of building a farm

    Learn how to hire a barn builder with expert guidance on finding qualified pros, asking the right questions, and ensuring your barn project succeeds.