Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Moore, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Moore, OK?

Select your specific project to find the pro for you.

TRUSTED BY MOORE, OK HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon143
    Verified above ground pool installation services reviews

Find Above ground pool installation pros in Moore

Avatar for AFFORDABLE POOL SOLUTIONS
AFFORDABLE POOL SOLUTIONS
4.7(
21
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Moore, OK and surrounding areas

In business since 2004

Free estimates

Emergency services offered

"APS (Kirk) has provided pool opening/closing and equipment maintenance services for us for several years. Always prompt, efficient, friendly. We recommend them and will continue to use them."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Response time7 hrs
Response rate100%
Recommended by95%of homeowners
Avatar for Airco Service Inc
Airco Service Inc
4.6(
429
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Moore, OK and surrounding areas

In business since 1961

Free estimates

Emergency services offered

"Jody Ramon and Brian Owens were the lead men and Justin, a supervisor, and Nick Ecker, a salesperson were active members of this team. Cody helped install the 2nd day. Each of these men were more than I could ever expect. They did their part of the process and worked personally to service us as if we were family. They dealt with every concern we had, worked steadily for 2 and 1/2 full days, and left our home in better condition than they found it. The protected our carpets and cleaned up at the end of each work day. We have had an ongoing service relationship with Airco for over 10 years. So far, every person Airco has ever sent us has really serviced us outstandingly well. However, this removal and installation was over the top!! We really are pleased. The final chapter of the process will be schedule for next Wednesday when the Airco technician and the Sand Springs code inspector makes their final visit. Be sure to note that Jody and Brian have to be 2 of your very best crew members. Chris Holmes was our service man for several years but he now is doing commercial accounts for Airco. Jerry Evans, I believe his name is, now services our HVAC on a twice a year contract we have with you. Chris and Jerry are local Sand Springs residents and have really done our work well over the time period we have used Airco. But, this week with the men mentioned above has just been super!! They did everything and more than was ever promised. So far, we are really please with this big upgrade. For us, it was an extremely major decision and it went so well, thanks to this team that came together on our project!! We are so very grateful!!"
Recommended by92%of homeowners
OKC Pool Services LLC
4.7(
3
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Moore, OK and surrounding areas

In business since 2018

Free estimates

Credit card accepted

We're excited to work with you in creating your outside oasis and kicking of your summer to a great and fun start. We offer a wide variety of outdoor leisure products and services. From swimming pool construction to decks and Pergolas. Call Today to and tell us about your project.

Recommended by100%of homeowners
Showing 1-10 of 44
Install Above Ground Pools questions, answered by experts

If you put too much baking soda in your pool, your alkalinity will rise. That means you’ll need to take steps to lower your alkalinity. You can either add more water (which will require more chemicals because they’ll be diluted), wait for the alkalinity to lower naturally, or use a chemical like muriatic acid to lower it. 

The best temperature to paint a pool deck is between 50 and 90 degrees Fahrenheit, because many paints and sealers require temperatures warm enough for the chemical reaction to take place for proper curing. The paint should not be allowed to freeze, and temperatures above 90 degrees can cause the paint to dry too quickly, also preventing the chemical reaction from following through to completion.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

Yes, you will need to shock your pool with high levels of chlorine or bromine when you first fill it to kill off bacteria and pathogens. You’ll need to wait for the chlorine concentration to come back down to a safe level before swimming. After that, you can test and maintain the chlorine and other levels as normal. The only exception to this is if you get pool water delivered by a professional. In that case, the water might come pretreated, so you might not need to shock it.

A few factors influence the time it takes for a pool to heat up, including the size of your pool, the temperature outside, and how much direct sunlight is hitting the water in the pool. With these factors in mind, it takes 12 to 72 hours to raise the temperature in a pool by 20 degrees Fahrenheit.

While you can run a pool heater all day, it is advised only to run it during the day, as it is more energy efficient. At night, it is better to purchase a solar pool cover to retain the heat within the pool.

The Moore, OK homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.