Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Bethany, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Bethany, OK?

Select your specific project to find the pro for you.

TRUSTED BY BETHANY, OK HOMEOWNERS

  • Average homeowner rating star icon4.1
    Average homeowner rating
  • Verified reviews icon127
    Verified above ground pool installation services reviews

Find Above ground pool installation pros in Bethany

Avatar for Pleasant Pools and Spas
Pleasant Pools and Spas
3.0(
106
)
Swimming Pool - Above Ground, Build or Install - Need Materials

Serving Bethany, OK and surrounding areas

Approved

In business since 1978

Free estimates

Warranties offered

"Great job renovating a hundred year old pool. Mr Fleming kept me advised of the project and was very efficient in getting the project completed. Pool looks and feels great!! All the work was done very professionally, and I am very pleased with the result!"
 Pool
 Pool and Spa
 Fiber optic lighting
 Top view
 Vanishing Edge

+8

Response time3 days
Recommended by76%of homeowners
Avatar for AB POOLS, CONCRETE, AND MORE LLC
AB POOLS, CONCRETE, AND MORE LLC
5.0(
4
)
Swimming Pool - Above Ground, Build or Install - Have Materials

Serving Bethany, OK and surrounding areas

Approved

In business since 2024

Free estimates

Warranties offered

10 years of experience. We take great pride in our experience, expertise, quality and customer service that we provide to meet consumer needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our clients, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small.

Norman OK
5 neighbors recently requested a quote
OKC Pool Services LLC
4.7(
3
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Bethany, OK and surrounding areas

In business since 2018

Free estimates

Credit card accepted

We're excited to work with you in creating your outside oasis and kicking of your summer to a great and fun start. We offer a wide variety of outdoor leisure products and services. From swimming pool construction to decks and Pergolas. Call Today to and tell us about your project.

Recommended by100%of homeowners
Showing 1-10 of 44
Install Above Ground Pools questions, answered by experts

The most straightforward approach to filling an in-ground swimming pool is to connect a garden hose from your exterior tap. However, this is not the best idea if there's water scarcity or restricted rationing. If so, you'll want to make alternate arrangements, like getting a water delivery service to fill your pool.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

It’s a good idea to wait at least 24 hours after opening your pool before you swim in it. Pool opening often involves shocking the water, and the chemical levels need to come down a bit before it’s safe to swim. You can continue testing your water pH and chlorine levels if you’re in a rush. It’s wise to wait until your chlorine levels drop to under four parts per million (ppm) and you have a water pH of between 7.2 and 7.8. You can artificially lower your water pH to speed up the process.

No, you shouldn’t be able to taste the salt at all since saltwater pools only contain about 10% of the salt you’d find in ocean water. Saltwater pools do create some chlorine, though, so you should still try not to drink the water.

It's not ideal, and if your pool’s pH is seriously low (below 7), swimming can be dangerous until you raise it, potentially causing severe irritation and damage to the skin and eyes.

Keep in mind that low pH can also be responsible for damaging the pool itself. Acidic water can contribute to the cracking of your pool's liner, which may cost up to $2,500 to replace, making this an expensive fix.

The Bethany, OK homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.