Top-rated basement remodelers.

Best basement remodelers near Smithville, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Smithville, NY?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Smithville - Updated Nov 2026

Avatar for Doyle's Home Carpentry
Doyle's Home Carpentry
5.0(
40
)
Basement - Remodel

Serving Smithville, NY and surrounding areas

Approved

In business since 2020

Free estimates

Small jobs welcome

"I have hired this company for multiple projects over the last 2 years. Electrical, plumbing, bathroom remodel, widow installation and hooking up my propane stove. I will be a return customer each year until my projects at home are done lol. Doyle's Home Carpentry can do just about everything you need done and it gets done right the first time. If it is something he can't do or something that is not worth doing, he will tell you straight up. Very honest company and I do recommend using him for your projects!"
Camp addition
Camp addition
Kitchen backsplash
Kitchen backsplash
New electrical outlets

+67

Response time3 hrs
Response rate100%
2 neighbors recently requested a quote
Avatar for Travani Construction, LLC
Travani Construction, LLC
4.0(
5
)
Basement - Remodel

Serving Smithville, NY and surrounding areas

Approved

In business since 2020

Free estimates

Emergency services offered

"We were pleased with our bathroom renovation. We found Travani Construction to be reliable and personable to work with. The cost was reasonable. I have recommended their work to several friends."
Response time2 days
10 neighbors recently requested a quote
Avatar for J.Garrison property maintenance
J.Garrison property maintenance
New to Angi
Basement - Remodel

Serving Smithville, NY and surrounding areas

Approved

Free estimates

Small jobs welcome

Credit card accepted

Here at J.Garrison property maintenance we specialize in landscaping and general property maintenance we take much pride in our work to ensure our customers high quality and reliability we specialize in lawn care, spring /fall clean up, tree trimming, mulch/topsoil, also retaining walls and small concrete jobs

Backyard restoration
Backyard restoration
Backyard restoration
Lawn care 2025
Lawn care 2025

+5

Dream Designs
New to Angi
Basement - Remodel

Serving Smithville, NY and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

My name is Rusty Wescott and after working 22 years building from the ground up, 22 years of dialing in my skills.But my other love is art I have always loved art, from my paintings, to wall murals, to home decor, and custom furniture. And Dream Designs new add-on is epoxy, tables,floors,countertops, stair treads and risers with a epoxy pour design, we pride our self on customers satisfaction, and if you can dream it up we can design and build it for you to make your dreams reality.

Demo
Sabrinas remodel
Sabrinas remodel
Demo
Sabrinas remodel

+17

22 neighbors recently requested a quote
...
Showing 1-10 of 103
Basement Remodel FAQs, answered by experts

Basements are commonly converted into game rooms. The potential challenges you may run into include controlling moisture, working with low ceilings, limited natural light, and the need for additional electrical or HVAC work. Addressing these issues can add to the total cost, but it ensures a comfortable and functional space.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

For most basement remodels, you’ll want to hire a general contractor. This is for a number of reasons, but the main two are that general contractors have dedicated teams they are comfortable with, and hiring one means you only have to deal with one pro. You may also get a better project quote since they can lump all their work and subcontracting into a single quote. 

When considering finishing your basement, take into account a few pros and cons:

Pros

  • Can increase the value of your home

  • Separate space from the rest of the house 

  • Customize and personalize the basement to suit your needs and style

  • Increase the amount of living space in your home

Cons

  • May not regain enough value to cover the cost of finishing

  • Lack of natural light if it’s below ground level

  • Moisture or flooding can cause costly damage

  • Installing plumbing and electrical can be messy and costly

The Smithville, NY homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.