Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Bellaire, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Bellaire, MI?

Select your specific project to find the pro for you.

TRUSTED BY BELLAIRE, MI HOMEOWNERS

  • Average homeowner rating star icon4.9
    Average homeowner rating
  • Verified reviews icon11
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Bellaire

Tims Concrete Services, LLC
5.0(
2
)
Concrete Driveways & Floors - Install- For Business

Serving Bellaire, MI and surrounding areas

Approved

In business since 2018

Free estimates

Customers say: Quick response

"Tim showed up on time and had the job done perfectly. He works with a smile and does not charge you your life savings for the service. Mancelona needs Tim and the services he offers. Highly recommend!"
Response time3 days
2 neighbors recently requested a quote
Recommended by100%of homeowners
...
Showing 1-10 of 59
Asphalt Driveways questions, answered by experts

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Building a road on a slope requires careful planning and will normally require a drainage system underneath to prevent flooding and damage to the road over time. Your professional may lengthen your road to create switchbacks if the slope directly to your home is too steep, as there are regulations for maximum road slope. The drainage system will help prevent runoff from the higher side of the slope from damaging the asphalt or concrete. Keep in mind that building a road on a slope isn’t a good DIY project, as a lot can go wrong.

To maintain their strength, asphalt driveways and parking lots need to be sealcoated once every two to five years. You may also need to reapply paint striping every few years as it fades to ensure drivers can safely navigate the parking lot.

In the United States, roads are usually categorized as one of three types: public roads, other drivable roads, and non-drivable roads. These categories dictate how a road can be used; a non-drivable road might be classified that way because it is heavily damaged and unsafe for cars.

The Bellaire, MI homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.