Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Mancelona, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Mancelona, MI?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Mancelona

Tims Concrete Services, LLC
5.0(
2
)
Concrete Driveways & Floors - Install- For Business

Serving Mancelona, MI and surrounding areas

Approved

In business since 2018

Free estimates

Customers say: Quick response

"Tim showed up on time and had the job done perfectly. He works with a smile and does not charge you your life savings for the service. Mancelona needs Tim and the services he offers. Highly recommend!"
Response time3 days
3 neighbors recently requested a quote
Recommended by100%of homeowners
...
Showing 1-10 of 63
Asphalt Driveways questions, answered by experts

Whether it's worth it to install a heated driveway depends on how often you'll use it, your lifestyle, and your budget. If you live in a mild climate with little snowfall, then installing a built-in heated driveway system may not be worth it. If you live in a region that experiences mild snowfall, then a portable mat could work better. However, if you live in a region with heavy snowfall, it makes sense to invest in a built-in heated driveway. 

Asphalt is made of aggregate materials (sand, rocks, and gravel) and bitumen, a viscous, petroleum-based, waterproof substance. These materials are mixed together at extremely high temperatures to form asphalt.

Like all driveway materials, asphalt can crack in the wrong conditions and with age. Many things can cause asphalt to crack, including shifting soil or settling under the foundation. Other common causes are driving oversized vehicles on the asphalt, tree roots, and using rock salt during the snowy season. Proper installation and sealing the driveway every 10 years can help prevent cracks.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

The driveway apron is a technical term referring to where a private driveway meets the public street. If there is a sidewalk in front of the house, the driveway apron is typically on the opposite side of the public sidewalk from the driveway itself.

The Mancelona, MI homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.