Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Boyne Falls, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Boyne Falls, MI?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Boyne Falls

Avatar for Property Services of Michigan
Property Services of Michigan
5.0(
3
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Paving - Repair or Patch+1 more

Serving Boyne Falls, MI and surrounding areas

In business since 2007

Free estimates

Emergency services offered

"He gave me a quote and did exactly what he said he was going to do. He was clear about to procedure and what he needed to do. It was nice and clean after the service, I didn't have to do any touch ups or clean ups. I was so happy with the results, I hired him to complete resurface my driveway."
Recommended by100%of homeowners
Showing 1-10 of 48
Asphalt Driveways questions, answered by experts

The answer to whether or not you need to get a permit before you start your driveway can vary widely based on local ordinances and the scope of your driveway ideas. In most urban and suburban areas, a permit is needed before building a new driveway to ensure that a homeowner is using safe materials and proper drainage practices while designing and constructing a new driveway. In some rural areas, a homeowner may not be required to apply for a permit. When building a new driveway on your own, always check with your local building department to see if you need to request a permit. When hiring a driveway contractor, verify that the right permits are being used before driveway construction begins.

The driveway apron is a technical term referring to where a private driveway meets the public street. If there is a sidewalk in front of the house, the driveway apron is typically on the opposite side of the public sidewalk from the driveway itself.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

You should contact your driveway installer before winterizing a newly installed driveway. Winterizing it before the asphalt or concrete has fully cured can damage the driveway. But in many cases, you don't need to winterize a newly installed driveway anyway since it's likely freshly sealed and won't have much damage yet. 

An asphalt driveway should be at least 3 inches thick over a compacted gravel base. Areas with poor drainage should have a thicker stone base. To install a new asphalt driveway over an existing driveway, the new asphalt should be at least 2 inches thick and the existing driveway should be in relatively good condition.

The Boyne Falls, MI homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.