Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Central Lake, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Central Lake, MI?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Central Lake

Tims Concrete Services, LLC
5.0(
2
)
Concrete Driveways & Floors - Install- For Business

Serving Central Lake, MI and surrounding areas

Approved

In business since 2018

Free estimates

Customers say: Quick response

"Tim showed up on time and had the job done perfectly. He works with a smile and does not charge you your life savings for the service. Mancelona needs Tim and the services he offers. Highly recommend!"
Response time3 days
1 neighbors recently requested a quote
Recommended by100%of homeowners
...
Showing 1-10 of 55
Asphalt Driveways questions, answered by experts

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Your city or county will have guidelines about the minimum and maximum width and length of private roads. The average private road is 12 feet wide, and length, of course, depends on your property. Requirements also depend on the amount of traffic and types of vehicles your road experiences. Check with local ordinances before planning a road on your property.

If you’re looking for a similar, eco-friendly driveway material, you might consider one of these options:

  • Permeable pavement: This material is sometimes called “pervious” or “porous” pavement; it allows stormwater to drain into the subbase, eliminating storm drain costs. 

  • Gravel: Consider paving your driveway with locally sourced gravel. By sourcing from a nearby source, your money won’t fund international shipping and will be invested back into your local community.

  • Natural stone pavers: Because natural stone pavers are made from organically-produced stone, there’s no new manufacturing required, limiting the environmental impact. In addition, water easily flows and drains through the gaps in the pavers.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

You can expect your asphalt pavement to last anywhere from 20 to 30 years, or 25 years on average. The life expectancy of your asphalt driveway depends on the climate, the amount of traffic, and how well you maintain it. While you can’t necessarily control some of these factors, you can control the amount of maintenance effort you put into your driveway. 

To prevent your asphalt from deteriorating prematurely, you should follow a good maintenance routine involving regular cleaning, reparation work, and resealing.

The Central Lake, MI homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.