Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Kingsley, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Kingsley, MI?

Select your specific project to find the pro for you.

TRUSTED BY KINGSLEY, MI HOMEOWNERS

  • Average homeowner rating star icon4.2
    Average homeowner rating
  • Verified reviews icon18
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Kingsley

Double K Services
4.6(
58
)
Interlocking Pavers for Driveways & Floors - Install

Serving Kingsley, MI and surrounding areas

Approved

In business since 1999

Free estimates

Emergency services offered

"I reached out to Kris about lawn mowing this spring/summer. He was immediate with his response and came out right away to begin his service (even when it started raining). He was so fast, but very pristine with his mowing which helps so much since we have customers around often. I?m so grateful for Kris?s help and really look forward to using his business this spring/summer and hopefully years to come! Highly recommend!!"
Response time2 days
3 neighbors recently requested a quote
Recommended by98%of homeowners
Avatar for Liquid Roofing and Construction
Liquid Roofing and Construction
4.5(
15
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Paving - Repair or Patch+1 more

Serving Kingsley, MI and surrounding areas

In business since 2004

Free estimates

Emergency services offered

"I hired them to re-roof my home and in conversation I mentioned I need to have my asphalt driveway sealed, not even knowing they do this work too. They asked me if they could bid on the driveway project too. This all happened in a short timeframe and I was very impressed by their timeliness and quality of work. The owner came and inspected the roof after completion and asked me to look at it with him. We climbed up the ladder and he explained everything and answered my questions. I was thoroughly impressed and want to hire them again for additional work this summer."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+51

Recommended by100%of homeowners
...
Showing 1-10 of 61
Asphalt Driveways questions, answered by experts

It’s best to weigh the pros and cons of each material and decide on your priorities for your driveway. Gravel won’t be an appropriate choice if your driveway experiences heavy traffic. You’ll find that you need to level and top it off regularly, which could make the material a much more expensive option.

Asphalt dries and cures best between 50 and 85 degrees Fahrenheit. This range allows moisture to evaporate quickly without causing the asphalt to cool too fast, which can negatively affect the drying process. However, keep in mind that other weather conditions can also affect curing and drying times, such as precipitation and humidity.

The answer to whether or not you need to get a permit before you start your driveway can vary widely based on local ordinances and the scope of your driveway ideas. In most urban and suburban areas, a permit is needed before building a new driveway to ensure that a homeowner is using safe materials and proper drainage practices while designing and constructing a new driveway. In some rural areas, a homeowner may not be required to apply for a permit. When building a new driveway on your own, always check with your local building department to see if you need to request a permit. When hiring a driveway contractor, verify that the right permits are being used before driveway construction begins.

Asphalt driveways last anywhere from 15 to 30 years, but if you don’t stay on top of repairs, you may find yourself spending extra to replace your driveway before its typical lifespan. Stay on top of repairing cracks and potholes by routinely inspecting your driveway once or twice a year. It’s a good idea to pressure wash your asphalt driveway at least once a year to keep it clean. Apply a sealer every one to five years, based on your climate.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

The Kingsley, MI homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.