Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Kingsley, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Kingsley, MI?

Select your specific project to find the pro for you.

TRUSTED BY KINGSLEY, MI HOMEOWNERS

  • Average homeowner rating star icon4.2
    Average homeowner rating
  • Verified reviews icon18
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Kingsley

Double K Services
4.6(
58
)
Interlocking Pavers for Driveways & Floors - Install

Serving Kingsley, MI and surrounding areas

Approved

In business since 1999

Free estimates

Emergency services offered

"I reached out to Kris about lawn mowing this spring/summer. He was immediate with his response and came out right away to begin his service (even when it started raining). He was so fast, but very pristine with his mowing which helps so much since we have customers around often. I?m so grateful for Kris?s help and really look forward to using his business this spring/summer and hopefully years to come! Highly recommend!!"
Response time2 days
2 neighbors recently requested a quote
Recommended by98%of homeowners
Avatar for Liquid Roofing and Construction
Liquid Roofing and Construction
4.5(
15
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Paving - Repair or Patch+1 more

Serving Kingsley, MI and surrounding areas

In business since 2004

Free estimates

Emergency services offered

"I hired them to re-roof my home and in conversation I mentioned I need to have my asphalt driveway sealed, not even knowing they do this work too. They asked me if they could bid on the driveway project too. This all happened in a short timeframe and I was very impressed by their timeliness and quality of work. The owner came and inspected the roof after completion and asked me to look at it with him. We climbed up the ladder and he explained everything and answered my questions. I was thoroughly impressed and want to hire them again for additional work this summer."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+51

Recommended by100%of homeowners
...
Showing 1-10 of 61
Asphalt Driveways questions, answered by experts

A driveway approach is the part of a driveway where the public road meets the private driveway. This section contains several key elements, including the driveway apron, the curb cut, and the end slope. Depending on the slope of the driveway, this area may also contain the trench drain.

When hiring an asphalt paving contractor to install your driveway, ask as many questions up front as possible. Here are a few questions to ask a prospective driveway contractor:

  • How many years of experience do you have?

  • Are you licensed, bonded, and insured?

  • Do you have worker’s compensation?

  • Do you use subcontractors on your projects?

  • Do you clean up after the job is done?

  • Who is responsible for any damage to lawn or landscaping?

  • Do you provide a guarantee or warranty on your work?

  • Do you give free estimates?

  • What is the timeline for completion?

  • How do you handle change orders?

  • Can you provide at least three references?

  • Can I see some of the work you’ve done?

In most cases, you don’t need a permit to repave your driveway, although some exceptions exist. If you’re widening your driveway and plan on widening the apron as well, you’ll usually need a permit from the Department of Transportation in your area. This permit costs between $50 and $300 in most cases. Most municipalities will also require a certified and insured contractor do the work relating to the apron and curb cut. You can contact your building department or ask your paving company if you need a permit. Your driveway professional will usually pull the permit for you.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

In the United States, roads are usually categorized as one of three types: public roads, other drivable roads, and non-drivable roads. These categories dictate how a road can be used; a non-drivable road might be classified that way because it is heavily damaged and unsafe for cars.

The Kingsley, MI homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.