Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Kingsley, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Kingsley, MI?

Select your specific project to find the pro for you.

TRUSTED BY KINGSLEY, MI HOMEOWNERS

  • Average homeowner rating star icon4.2
    Average homeowner rating
  • Verified reviews icon18
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Kingsley

Double K Services
4.6(
58
)
Interlocking Pavers for Driveways & Floors - Install

Serving Kingsley, MI and surrounding areas

Approved

In business since 1999

Free estimates

Emergency services offered

"I reached out to Kris about lawn mowing this spring/summer. He was immediate with his response and came out right away to begin his service (even when it started raining). He was so fast, but very pristine with his mowing which helps so much since we have customers around often. I?m so grateful for Kris?s help and really look forward to using his business this spring/summer and hopefully years to come! Highly recommend!!"
Response time2 days
4 neighbors recently requested a quote
Recommended by98%of homeowners
Avatar for Deuces landscaping & Excavation
Deuces landscaping & Excavation
5.0(
10
)
Gravel or Loose Fill Paving - Install, Spread or ScrapeConcrete Driveways & Floors - Install- For Business

Serving Kingsley, MI and surrounding areas

Approved

In business since 2022

Offers commercial services

"Joe and his crew did a fantastic job!!! Always keeping in contact with me and my husband. He is an all in one guy. He removed a huge pine tree in order to get out drain field in, put our fence back together and even hydro seeded our lawn. I would give this guy a 10 star if I could."
Project Photos
Project Photos
Project Photos
Project Photos
Project Photos

+2

40 neighbors recently requested a quote
...
Showing 1-10 of 61
Asphalt Driveways questions, answered by experts

The answer to whether or not you need to get a permit before you start your driveway can vary widely based on local ordinances and the scope of your driveway ideas. In most urban and suburban areas, a permit is needed before building a new driveway to ensure that a homeowner is using safe materials and proper drainage practices while designing and constructing a new driveway. In some rural areas, a homeowner may not be required to apply for a permit. When building a new driveway on your own, always check with your local building department to see if you need to request a permit. When hiring a driveway contractor, verify that the right permits are being used before driveway construction begins.

Asphalt, which is stone mixed with tar, is the most common material for outdoor basketball courts because it’s so sturdy and versatile. However, you don't have to use it: another option is polymeric rubber, which has shock pads that can prevent injury. This option is a little more expensive, ranging between $16 and $25 per square foot.

Materials used for indoor basketball courts, such as hardwoods, aren’t really an option outdoors.

Asphalt dries and cures best between 50 and 85 degrees Fahrenheit. This range allows moisture to evaporate quickly without causing the asphalt to cool too fast, which can negatively affect the drying process. However, keep in mind that other weather conditions can also affect curing and drying times, such as precipitation and humidity.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Kingsley, MI homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.