"Most reasonable bid made among three for retaining wall, aggregate spread on drive, and loose-layering of steppers for garden. I appreciated that Chad incorporated some of my creative ideas. He fit this minor project in between two immense ones-- I waited 5 weeks, less than expected. Ted and Carlos worked steadily and hard. I appreciated their updates when I inquired about progress as they labored on."
"The Liquid Construction Team was awesome. They are efficient, thorough, and professional. Their prices are very reasonable and competitive. Their commitment to customer satisfaction is exceedingly obvious."
"The price was fair. When they originally came to do it, there was not enough road gravel down so we had to have the other guy come back and redo that. We kept getting a promise date and then they wouldn't show. It took a while to get them back so we were a little disappointed with them. We couldn't reach them. We would leave messages and they wouldn't call back. Since we missed our first opportunity, then we got pushed back and they took care of the other places. They should have responded and let us know. When they finally did come the crew was great and the finished product was good. The pricing was in the ballpark. This was set up through our contractor. They did finally come when they said but it took 3 times. We might look for somebody else in the future."
"It wasn't good. They were repairing a wall and he dug it out, but when he put it back up it was the used blocks that he was putting back up and he didn't pay any attention to how he was doing it. He had a couple of his kids helping and he put them, one had cement from the previous original job and he put that facing up instead of using the blocks that were on top as the top. And some of them were broken and he just put them back in and there wasn't enough and he couldn't find anything to use additionally to fill in for the ones that were missing and I'm not sure if it was quite as straight as it should be but it's in place well enough to be effective."
We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's custom needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.
"Joel and his team did a great job. Arrived on time, were diligent in their work and paid attention to the details. They stuck right with the project until completion. At the end Joel took the time to review everything to make sure it finished as expected. Well done. And I already have more work lined up for Joel and his team."
New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.
During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.
The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.
If you notice minor cosmetic problems with your driveway, you should seal it. Look out for cracks and holes on the surface, faded asphalt or concrete, and stains from oil and other chemicals. Replacing your driveway may be necessary if you’re dealing with significant problems—¼-inch cracks, large potholes, and puddles from drainage issues. The cost to install an asphalt driveway typically ranges between $4,200 and $9,000, significantly more than resealing. Consider talking to a professional to discuss whether resurfacing your driveway—a midway project between resealing and replacing—is a better option for you.
Driveways should be sloped with a minimum 2% slope—anything lower will cause precipitation and runoff to collect. A 2% slope is the equivalent of a 2-foot rise over 100 feet. One quick way to check the integrity of your driveway’s slope: no more than four inches of water should collect on the surface longer than 15 minutes after rain.
A solid driveway starts with the right asphalt mix, and for most homes, dense-graded hot mix asphalt (HMA) is the most recommended. It’s both durable and flexible, making it a reliable choice for residential use. A properly compacted 2-3 inch layer on a well-prepared crushed stone base will hold up for years. In areas with harsh winters or scorching summers, a slightly modified mix can help prevent cracking and rutting. No matter the climate, quality installation is just as important as the material itself, so hiring an experienced contractor ensures a smooth, long-lasting driveway built to last.
By grading and compacting the base soil, ensuring proper drainage and stability.
The Northport, MI homeowners’ guide to asphalt driveway services
From average costs to expert advice, get all the answers you need to get your job done.
Learn how to find a top-rated asphalt driveway sealing pro by checking credentials and asking the right questions to ensure your pavement is protected.
Adding a new asphalt driveway to your home can boost its overall appearance and give homeowners a nice ROI down the line. But how long do asphalt driveways last, and what can you do to maximize their lifespans? Read this guide to find out.