Top-rated pole barn builders.

Get matched with top pole barn builders in Roachdale, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your pole barn building project in Roachdale, IN?

Select your specific project to find the pro for you.

TRUSTED BY ROACHDALE, IN HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon20
    Verified pole barn building services reviews

Find Pole barn builders in Roachdale

JMD Home Services LLC
New to Angi
Shed, Barn or Playhouse - Repair

Serving Roachdale, IN and surrounding areas

Approved

Free estimates

Small jobs welcome

Hi there! I have about 9 years of experience with home remodeling, house flips, and currently I am focused more on carpentry (custom closets, interior/exterior trim, etc.) and flooring. I am still open to most home repair needs. I am new to Angi, but feel free to check out some photos of my work in the project photos. I am also willing to share more photos. Feel free to email me at [email protected] or call/text at 3179032308. Thanks!

Full Bathroom Remodel
Full Bathroom Remodel
Custom closet
Custom closet
Response time10 mins
Response rate100%
Avatar for C & A's Chimney Sweep & Lawn Maintenance Services
C & A's Chimney Sweep & Lawn Maintenance Services
4.7(
1,376
)
Shed, Barn or Playhouse - Repair

Serving Roachdale, IN and surrounding areas

In business since 2009

"C&A did a excellent job, they were cheaper than the other estimates I got. However I had no issues at all. I even got a stainless steel chase installed for the price most were charging for galvanized metal one's. I went with the stainless due to the fact it will last forever. C&A clean up nicely. There were prompt, and professional. I would recommend them. Tim Anderson the owner was very honest and professional. Thanks C&A. It seems its hard to find good help these days, No problem with C&A."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by92%of homeowners
Avatar for Claudia's Cleaning Services
Claudia's Cleaning Services
4.6(
155
)
Shed, Barn or Playhouse - Build

Serving Roachdale, IN and surrounding areas

In business since 1988

Free estimates

Emergency services offered

"They were great! We were moving and they made the house we were selling look brand new! They also came to the house we bought a few days later and made us fall in love with it even more. They are thorough and reasonable with prices. Definitely recommend 10/10."
After cleaning
Before cleaning
Oven cleaning
oven cleaning
Response time11 hrs
Recommended by95%of homeowners
All Star Building Corp
4.4(
28
)
Shed, Barn or Playhouse - Repair

Serving Roachdale, IN and surrounding areas

In business since 2001

Free estimates

Emergency services offered

"The employees at All Star Building Corp. were out standing they were on time and worked was done in a timely manner.
One of the things that I liked most about All Star Building Corp, was the way that they took note of a little play pool in the back yard and my dogs. I noticed that they went out of there way to control the mess when removing my old roof. I know that all contractors in this line of work try to do this, but these guys took it to a new level, I had to stop in at the house a few times while they were working they did not know I was there, but I noticed that they were going out of their way to be sure that none of the old roof or nails fell in the back yard. Now I did not ask them to do this, don't even think that I said any thing about my dogs, that is what made me notice. They were just doing all they could to keep everything contained. When they were done my son and I did a very thorough inspection of the yard for the safety of the dogs and found no shingles or nails any where.
The fact is they did a great job on all the work they had to do and also cared enough to take the extra steps to not put my dogs at risk. This meant a lot to me.
More companies should be like this."
Recommended by87%of homeowners
Avatar for Schriber's Flooring LLC
Schriber's Flooring LLC
4.8(
52
)
Shed, Barn or Playhouse - Repair

Serving Roachdale, IN and surrounding areas

In business since 2009

Free estimates

Credit card accepted

"Trey and his crew did a fantastic job removing our old flooring and installing new vinyl planking. They replaced roughly 900 sq feet and were able to get everything done in one day. His prices were very fair as well. Would highly recommend"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+64

Recommended by97%of homeowners
Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.1(
151
)
Shed, Barn or Playhouse - Build

Serving Roachdale, IN and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+70

Recommended by84%of homeowners
Avatar for CALIBER CONSTRUCTION
CALIBER CONSTRUCTION
4.2(
53
)
Shed, Barn or Playhouse - Build

Serving Roachdale, IN and surrounding areas

In business since 2004

Free estimates

Emergency services offered

"It took longer than i expected for the contractor to finally show up and complete the gutter installation. However, once they arrived all went well. They were very professional and knew what they were doing.
"
Recommended by88%of homeowners
...
Showing 1-10 of 67
Pole Barn Builders questions, answered by experts

Any type of construction that damages a tree’s roots via soil compaction can be dangerous, and is one of the primary causes of mature tree death in residential areas. Simply putting lots of weight on the ground around the tree, like construction supplies, trailers, and equipment, can kill roots near the surface. Of course, installing new foundations, patios, or utility lines can cut through nearby tree roots. Accidentally striking a tree with equipment or supplies is rarely a problem, but can cause damage of its own, too.

The most significant expense when building a barndominium is constructing the metal shell, which includes the roof, doors, and windows. Additional exterior components impacting the overall cost include metal siding and the concrete foundation.

While prices fluctuate because of increased demand, fewer supplies, and engineering time, OSB generally remains more affordable than plywood at $1 to $2.40 per square foot compared to the $4.50 to $10 for plywood. Cost is only one factor you should consider when deciding between OSB and plywood.

The foundation for a pole barn should be at least 36 inches thick to ensure that the piers won’t shift from frost heave.

Your foundation contractor will first need to remove the topsoil and any vegetation within 4 feet of the area around the barn. They’ll need to ensure they have clear access to the site to begin excavation, after which they can begin construction.

The Roachdale, IN homeowners’ guide to pole barn building services

From average costs to expert advice, get all the answers you need to get your job done.

  • Farm blue barn shed and gravel driveway.

    If you’ve ever wondered what precisely a pole barn is, you’re about to find out. Not many know the advantages and disadvantages to the cost, construction style, and flexibility of building one on your own or hiring a contractor for the job.

  • framework of building a farm

    Learn how to hire a barn builder with expert guidance on finding qualified pros, asking the right questions, and ensuring your barn project succeeds.