Top-rated excavation pros.

Get matched with top excavation pros in Lapel, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Lapel, IN?

Select your specific project to find the pro for you.

TRUSTED BY LAPEL, IN HOMEOWNERS

  • Average homeowner rating star icon4.1
    Average homeowner rating
  • Verified reviews icon14
    Verified excavation services reviews

Find Excavation pros in Lapel

Avatar for Maynor Construction, LLC
Maynor Construction, LLC
4.3(
38
)
Building Site - Preparation and ClearingExcavation - Major Grading or Resloping

Serving Lapel, IN and surrounding areas

Approved

In business since 1995

Free estimates

Emergency services offered

"I rarely, if ever give 5 star reviews. But, I DO recommend Maynor Construction (MC)! But, 5 = perfection, and nothing is perfect : ) I hired MC for cement siding and sunroom addition project, beginning in June of 22, ending Sep, 22. I will review the Good, the Bad, and the Ugly. But, this doesn't cover everything, because Home Advisor only allows so many characters. Finally, this was my first (major) home improvement project and likely the largest investment I will ever make in my home. The Good - Maynor (owner) is a very knowledgeable and a skilled builder, with many years of experience. I appreciated that he was actually on site many days, not only supervising, but also working along side his team. - The administrative staff was magnificent. Responsive, knowledgeable, friendly, and available. Having the right people in the front office can make or break a business. Hire the right people to manage the office and it will pay dividends toward the success of your company...in my humble opinion. - I had fiber cement siding installed on my home, and a sunroom that replaced an old, broken-down outdoor breezeway. This was no easy project and teams of highly-skilled workers were at my home daily, typically from before 8am until nearly sundown - and even partially on Saturdays. We were blessed with very little rain through the 3 months, which accelerated the work. Maynor's team worked very hard, moved efficiently, and maintained a great level of skill throughout the process. The Bad - For the most part, none of my utilities were affected all that much. Utility boxes were moved away at the beginning, were moved back at the end, and worked just fine. I also had a lot of electrical added and moved throughout the project, but alterations and small inconveniences were to be expected. However, there was a problem when it came to Maynor's (unintended) disruption of my ATT Fiber. While there was no cutting of that fiber, the siding was installed over the fiber and it shut down my internet. Maynor's workers claimed innocence, but it was clearly something for which they were likely responsible. The fiber cable box was moved back into place, and when I got home the internet wasn't working any longer. This required ATT to come out and reinstall the fiber cable and box that came into my house from the outside. - Kitchen flooring fix. I have a very small special strip of (tiled) kitchen flooring that had to be removed during the remodel because I wanted a small portion of a wall removed. Years ago, this strip was created with very cool, colored, (intentionally) broken glass tiles. But, sadly those tiles are no longer available. Happily, I found some of the original kitchen tile that Maynor could break-up into pieces and install into the strip. I approved a change order for Maynor to fill-in that strip of flooring, which required some pretty major cutting of the floor and sub floor. However, they cut the floor crooked and at an unpleasing angle. And, while it is not terrible, it is very noticeable to me and I wish Maynor had done a better to cut the area straighter. I can live with it, but someday I will need to replace the entire kitchen floor to maintain the professional look. The Ugly - While I live in a populated area, with restaurants, a gas station, hotels, etc... workers, laboring in extremely hot summer conditions, even with lots of shade, require lots of hydration. Those fluids need to go somewhere! Unfortunately, there were at least two instances (likely more), I personally witnessed workers finding their own ways to relieve themselves - not inside my home, nor at the gas station just next door. I complained to Maynor and they promptly brought in, at their expense, a Porta Potty, which would remain for the duration of the project. But, I had to ask them to include and only after I discovered what was happening on my property. Ove..."
Sunroom 2
Sunroom 1
Screened In Porch 1
Screened In Porch 2
Sunroom & Screened Porch

+41

Response time2 days
9 neighbors recently requested a quote
Recommended by96%of homeowners
Avatar for REDLINE EXCAVATION AND LANDSCAPE, LLC
REDLINE EXCAVATION AND LANDSCAPE, LLC
5.0(
3
)
Excavation - Major Grading or ReslopingBuilding Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For Business+1 more

Serving Lapel, IN and surrounding areas

Approved

Free estimates

Credit card accepted

Offers commercial services

"We used Redline Excavation and Landscape to help prep our property and land for the installation of a 20 x40 metal building. Braden immediately began working to create the pad our building now sits on. It was evident he cares greatly about the work he does, and really takes customer satisfaction to heart. Our pad came together quickly, was level, and we had our building installed the same week. We cannot recommend Redline Excavation and Landscape enough! They are a small business with big heart."
Project Photos
Project Photos
Project Photos
4 neighbors recently requested a quote
...
Showing 1-10 of 141
Excavating questions, answered by experts

It takes one hour to dig a 10-foot trench by hand. Use a trenching shovel with a sharp tip and a long head. Plan for more time if your soil is heavy or rocky. Consider renting a trencher if you’re digging a long or deep trench or if you have challenging soil or terrain. 

Some two-in-one tools and machines do both jobs, and those could be the right solution for smaller residential projects. However, the phrase “use the right tool for the job” definitely applies to digging. For the best results, get two separate tools for your trenching and landscape edging projects or call a pro to take care of everything for you.

If you have a broken sprinkler pipe underground, there will be some signs you can easily spot to locate it and take action. These include leaks, water spouts, flooding, consistently damp areas on your lawn, low water pressure, and grass around the sprinkler head that’s taller and darker than anywhere else in the yard. 

If there are no obvious signs of a broken pipe, you can use tools such as water leak mics, leak noise loggers, audio devices that record leaks, and acoustic testing links. 

Broken pipes can lead to uneven watering, plant damage, and higher utility bills. The longer you wait to fix them the more the repair cost may be.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

Completion time ranges from days to weeks, contingent on project size, environmental conditions, and regulatory approvals.

The Lapel, IN homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.