Top-rated basement remodelers.

Get matched with top basement remodelers in Macon, GA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Macon, GA?

Select your specific project to find the pro for you.

Find Basement remodelers in Macon

Miller Light Construction LLC
5.0(
12
)

Serving Macon, GA and surrounding areas

Approved

In business since 2022

Free estimates

Emergency services offered

"Trevor has been an amazing contractor who has helped us through the process of installing a large interior door for an office. He has helped ensure the space was properly prepared for installation of the door. The other contractors who have assisted Trevor have also exceeded my expectations. They have been extremely detail oriented and have done everything to ensure the best outcome. I would definitely work with Trevor for any future projects."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+17

Response time2 days
Response rate100%
3 neighbors recently requested a quote
Avatar for Dalton Home Center
Dalton Home Center
5.0(
9
)

Serving Macon, GA and surrounding areas

Approved

In business since 2020

Free estimates

Emergency services offered

"We hired Dalton Home center for a remodel of our home, they were amazing to work with , communication was excellent, workmanship was excellent quality. We had our floors refinished, unused basement finished, appliances installed. It was a big job and we added things along the way as well. Prices were competitive. We recommend them highly."
Before Demo
Deck and Patio
Finished Jobs
Finished Product
Deck and Patio

+88

Response time1 day
10 neighbors recently requested a quote
Recommended by88%of homeowners
Vallett Builders, Inc.
4.3(
10
)

Serving Macon, GA and surrounding areas

In business since 1988

Free estimates

"A fairly substantial renovation, per our wallet, was done on an old farmhouse for us. As expected with such a project unanticipated items appeared as demolition progressed. We also added items as the project progressed with no hesitation on their part. I would suggest putting any change orders or items of concern in writing for memory reasons. However, items of concern were addressed to satisfaction. Project was completed timely and satisfactorily. Overall, very satisfied."
Large
Custom Decks
 Guest House Addition
Larger
Custom Decks

+10

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Macon, GA and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 36
Basement Remodel questions, answered by experts

A walkout basement is considered to be partially below grade because at least one wall is entirely exposed. In some cases and in specific municipalities, inspectors and appraisers will still count walkout basements as below grade, which means the space can’t serve as living space or be rented out. If you intend on using the area as living space or a separate apartment, you should check with your local building department to make sure it’s legal to do so.

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

Adding a bathroom to your basement can increase your home value since homes with multiple bathrooms sell for more. The return on investment (ROI) for a basement bathroom is 50% to 75%. The actual return varies with your home and location. Adding a half bath to your home increases the value by 2.9% while finishing a basement increases the home value by 6.6%.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Professional remodelers streamline the process, manage permits, and handle renovations efficiently—significantly mitigating risk while maintaining standards.

The Macon, GA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.