Top-rated subcontractors.

Get matched with top subcontractors in Avondale Estates, GA

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Avondale Estates, GA?

Select your specific project to find the pro for you.

TRUSTED BY AVONDALE ESTATES, GA HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon3.9k+
    Verified subcontracting services reviews

Find Subcontractors in Avondale Estates

Miller Light Construction LLC
5.0(
12
)
Major Home Repairs (General Contractor)

Serving Avondale Estates, GA and surrounding areas

Approved

In business since 2022

Free estimates

Emergency services offered

"As a real estate agent - I am always looking for reliable vendors to help me with my client's needs. Trevor and his crew have always been professional and easy to work with. I have used them in my personal home as well. I highly recommend them for all of your construction needs!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+17

Response time2 days
Response rate100%
6 neighbors recently requested a quote
Avatar for Beaver the Handyman & Home Renovations
Beaver the Handyman & Home Renovations
4.8(
18
)
Major Home Repairs (General Contractor)

Serving Avondale Estates, GA and surrounding areas

Approved

Super Service Award Winner

In business since 2019

Free estimates

Emergency services offered

"Jhony and his team replaced joists and main foundation beam in the crawl space. They also laid hardwood floors in my kitchen and laundry room area. I am very pleased with the work that was done. I would gladly recommend Jhony and his team to friends and family!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+189

Response time1 day
Response rate100%
4 neighbors recently requested a quote
Stephan Bass or SC Bass Construction LLC
4.6(
18
)
Major Home Repairs (General Contractor)

Serving Avondale Estates, GA and surrounding areas

In business since 1995

Free estimates

Emergency services offered

"On 23 Jan, I contacted Stephan Bass for help with repairing the broken upper (fixed) sash of a single-hung window in my master bathroom. Stephan came out almost immediately, assessed my problem, and referred me to one of his subcontractors, Derrius Thomas. I contacted "Dee" shortly thereafter and on 30 Jan, my window was measured for replacement. He gave me a cost estimate and an expected installation date for the repair. I was called twice with updates regarding the date and time I could expect the window to be repaired. On 8 Feb, in less than an hour, Dee installed my replacement sash."
Recommended by88%of homeowners
...
Showing 1-10 of 489
Subcontractors questions, answered by experts

Universal design costs can be minimal when you add them during construction; however, adding universal design principles to existing homes can sometimes increase renovation costs. For example, a mid-grade bathroom remodel is estimated to cost around $30,000, while a standard universal design remodel can cost closer to $40,000. Adding accessible design components can include widening hallways ($500 to $2,000), curbless showers ($2,000 to $8,000), and widening doors ($400 to $800). Keep in mind that these increased costs can lead to higher resale values because universal homes may appeal to a wider variety of buyers.

Designing a building takes 2-6 months, depending on project size, required permits, and revisions.

A floor plan is a less detailed illustration showing a building or room's layout from above, including elements like windows, doors, walls, and fixtures. It offers a simplified view for homeowners. In contrast, a blueprint is a more detailed, to-scale architectural drawing that includes all parts of the building plans, such as structural elements, construction details, and utility schematics. While a floor plan can be a type of view within a blueprint, the complete blueprint contains all the necessary details to turn the plan into a reality.

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

Italianate architecture is a reinterpretation of Renaissance styles, combining elements of Italian farmhouses and villas with Victorian materials and construction. This home style emerged in the Victorian era, gaining popularity in the U.S. in the mid-to late-1800s. The style came about in response to what many then viewed as the too-rigid and stuffy Classical style designs. 

The Avondale Estates, GA homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.