Top-rated flooring contractors.

Get matched with top flooring contractors in Villa Park, CA

Enter your zip and get matched with up to 5 pros

TRUSTED BY VILLA PARK, CA HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon302
    Verified flooring services reviews

Find Flooring contractors in Villa Park

GREAT SCOTT MAINTENANCE
4.9(
59
)
Wood Flooring - Install or Completely ReplaceWood Flooring - Install or Completely Replace - For BusinessWood Flooring - Refinish+3 more

Serving Villa Park, CA and surrounding areas

Approved

In business since 1980

Warranties offered

Customers say: True professional

"My Brazilian cherry floors in the family room had lots of staining from pets and needed help. Scotts Maintenance did a great job removing the stains and restoring the floor. It looks great now. I would highly recommend them."
1 neighbors recently requested a quote
Recommended by98%of homeowners
Avatar for Mario Diaz Flooring
Mario Diaz Flooring
4.6(
126
)
Wood Flooring - Install or Completely ReplaceWood Flooring - RefinishWood Flooring - Install or Completely Replace - For Business+3 more

Serving Villa Park, CA and surrounding areas

Approved

In business since 1993

Free estimates

Warranties offered

"It was a pleasure working with Mario, he is very knowledgeable and helpful. Mario?s team did a great job repairing my antique hardwood floor in my 110-year old house. There was water damage, dry rot and missing wood planks. They did a great job at blending in the new wood with the old wood. Professional, knowledgeable and friendly crew. The floors look beautiful! I highly recommend Mario Diaz Flooring.
The job took 3 days total including two coats of oil-based polyeurthane. Once the work was completed I had to wait a total of 48 hours before I could move my furniture back in (24 hours for the oil-based polyeurthane to dry and another 24 hours for it to cure). The smell of the top coat is very strong for the first 2-3 days as expected due to it being oil-based and not water-based. I chose a semi-gloss finish, no staining necessary. The type of wood we had to purchase to match my old floors was very expensive, but blended in nicely."
Meeting Angie Hicks
RED OAK FLOORS
BAMBOO FLOORS
1\2X1 1\2 RED OK FLOORS
Response time2 days
Response rate100%
3 neighbors recently requested a quote
Avatar for AK Hardwood Floors
AK Hardwood Floors
4.9(
33
)
Wood Flooring - RefinishWood Flooring - Install or Completely ReplaceWood Flooring - Repair or Partially Replace+2 more

Serving Villa Park, CA and surrounding areas

Approved

In business since 2020

Free estimates

Small jobs welcome

"Refinished wood floors; Excellent work, very professional and accommodating . Jorge, the owner, went above and beyond to make sure we were happy with the work. Worked around our schedule, moved all the furniture and back again and our floors looked like new. I highly recommend AK floors. You can’t go wrong with Jorge/AK FLOORS."
white oak natural
rosewood red oak floor
hardwood floor refinish
7146849980
Laminate floor installation

+7

Response time2 days
Response rate94%
4 neighbors recently requested a quote
Hassan Mohamed Abdelnaby
4.6(
277
)
Carpet - InstallLaminate Wood or Stone Flooring - InstallLuxury Vinyl Flooring - Install - Materials Not Provided by Consumer+2 more

Serving Villa Park, CA and surrounding areas

Approved

In business since 1991

Free estimates

Credit card accepted

"they did a wonderful Job for me and I had One Nick in my floor By a door which was even Hard for me to see But when I called them about it they came out On time that we agreed apon and fixed the problem By replacing the Piece with a Brand Now one .. I am very happy with my New floor and the service I got .. Thank you"
Untitled Gallery 1
Untitled Gallery 1
Untitled Gallery 1
Untitled Gallery 1
Response time8 hrs
Recommended by93%of homeowners
DJ Laguna Flooring
4.2(
233
)
Laminate Wood or Stone Flooring - InstallVinyl or Linoleum Sheet Flooring or Tiles - InstallLuxury Vinyl Flooring - Install - Materials Not Provided by Consumer+4 more

Serving Villa Park, CA and surrounding areas

Approved

Customers say: Terrific value

"Dave Laguna was great, his employees went above and beyond. Very professional, and very respectful. My floors turned out beautifully, I am very pleased. I definitely would recommend this company."
Response time1 day
Response rate100%
11 neighbors recently requested a quote
...
Showing 1-10 of 515
Flooring Installation questions, answered by experts

Yes, you can negotiate the purchase price of new carpet. You may also be able to negotiate installation costs or other fees in addition to the per-foot pricing of the carpet itself. You may have better luck negotiating with an independent retailer (as opposed to a big-box store), as they may have more discretion in pricing, but it’s always worth asking.

One of the upsides of cork flooring is that it's mold-resistant, so you don't have to worry about mildew or mold growth on wet cork. However, you should always clean up any moisture as soon as possible and use as little water as you need when cleaning. This will help you avoid issues like buckling or swelling in your cork flooring, which often requires replacement, and prevent moisture from seeping into your subfloor, which can cause the dreaded mold or mildew problems.

Laminate flooring takes about 24 to 48  hours to settle. Before this, planks are not completely acclimated to your home, and walking on them could cause shifting and permanent damage to the flooring. You should allow floorboards to acclimate for 48 to 72 hours before installing so that they can adjust to your home’s humidity and temperature levels, but they will continue to acclimate and settle after installation. For this reason, avoid placing any furniture in the room for 72 hours after installation.

Your floors will continue to settle for a few months after installation, becoming less bouncy as they rest.

It takes about one to two days to remove carpet and install laminate flooring for small and medium-sized rooms. A larger room may take an extra day to complete. If you’re replacing flooring throughout your house, expect closer to one to two weeks, depending on your home’s square footage.

If your floor is still sticky after mopping, chances are you used too much or too little of the cleaning solution. Using too little won’t get all of the grime off, but using too much can leave its own residue. Refer to the cleaning solution’s instructions and dilute it as directed.

The Villa Park, CA homeowners’ guide to flooring services

From average costs to expert advice, get all the answers you need to get your job done.