Top-rated subcontractors.

Get matched with top subcontractors in Tucson, AZ

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Tucson, AZ?

Select your specific project to find the pro for you.

TRUSTED BY TUCSON, AZ HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon2.5k+
    Verified subcontracting services reviews

Find Subcontractors in Tucson

Avatar for Ninja Builders, LLC
Ninja Builders, LLC
4.4(
27
)
Major Home Repairs (General Contractor)

Serving Tucson, AZ and surrounding areas

Approved

In business since 2014

Free estimates

Customers say: Terrific value

"Ninja Builders enclosed our back patio and did just what we asked of them. My husband was a builder for 40+ years prior to retirement and we understood exactly each step that Ninja Builders did in enclosing our patio. They used the best materials and fantastic labor/subcontractors. We have been extremely pleased with the job they did and also some of the follow up that needed to be addressed. A very professional contractor in all ways."
Deck  Ramp underway
Deck underway
Ramp
Ramp & Deck
Ramp Deck

+87

Response time1 day
1 neighbors recently requested a quote
Recommended by100%of homeowners
Palm Tree Construction, LLC
5.0(
1
)
Major Home Repairs (General Contractor)

Serving Tucson, AZ and surrounding areas

Approved

In business since 2022

Free estimates

Warranties offered

"I have quite a few contractors are come into my home to give me an estimate, and they were all very disappointing. Julio, come in today with his partner and was very professional. Give me some wonderful ideas for my kitchen. Remodeling and was very professional i did hire him to do my job"
Response time1 day
Response rate97%
37 neighbors recently requested a quote
Pantera Builders, LLC
New to Angi
Major Home Repairs (General Contractor)

Serving Tucson, AZ and surrounding areas

Approved

In business since 2000

Free estimates

Credit card accepted

We take great pride our experience, expertise, quality and customer service that we provide to meet the consumers' needs. It is our mission, to provide excellent customer service from start to completion of a project. To understand the needs and expectations of our customers, we take great care to work and communicate with every customer a personal and professional manner. Our reputation is based on service, safety and quality, regardless of how large or small the job.

...
Showing 1-10 of 127
Subcontractors questions, answered by experts

A split-level home is one that has several staggered floors connected by short staircases, while a split floor plan separates the primary bedroom from the rest of the bedrooms. Split floor plans are most often found in single-story homes, while split-level homes are always at least two stories.

Pros provide detailed quotes and efficient management, reducing overspending risks on materials and labor.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

Drawing your own floor plans is acceptable for many kinds of projects, including interior design and room layout. You can use floor plan software to create the plans but keep in mind that the floor plan will only be as accurate as the measurements you take and enter into the software.

The Tucson, AZ homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.