Top-rated bathtub replacement pros.

Get matched with top bathtub replacement pros in Glendale, AZ

Enter your zip and get matched with up to 5 pros

Need a pro for your bathtub replacement project in Glendale, AZ?

Select your specific project to find the pro for you.

TRUSTED BY GLENDALE, AZ HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon2.8k+
    Verified bathtub replacements reviews

Find Bathtub replacement pros in Glendale

Avatar for USA Showers
USA Showers
4.9(
29
)
Bathtub Install or Replace

Serving Glendale, AZ and surrounding areas

Approved (Corporate)

Super Service Award Winner

In business since 2023

Free estimates

Emergency services offered

"Brian is the best sales person around. He helped Brian helped me design my shower to my specifications. The process was easy. The USA app and sales people checked in weekly on progress. Tyler was great with the install. I” The shower looks great and I can’t wait to use."
Shower Installation
After photo-
After Photo
Two Toned
After- Sabana Creme

+20

Response time1 day
Response rate99%
271 neighbors recently requested a quote
Avatar for Black Diamond Home Services
Black Diamond Home Services
5.0(
17
)
Bathroom - RemodelBathtub Install or ReplaceBathroom - Remodel - For Business+1 more

Serving Glendale, AZ and surrounding areas

Approved

In business since 2021

Free estimates

Warranties offered

"Great partner in my bathroom remodel project - listened to me, made great options, worked around existing construction, and delivered a great looking bathroom. Paul and team were great to work with and very experienced. Demo, Construction, tiler, plumber, and coordination from Paul all delivered an outstanding bathroom remodel for a very fair cost."
Kitchen and Bath Remodeling Project
Remodeling - Kitchen & Bathroom Project
Shower remodel
Shower remodel
Remodeling - Kitchen & Bathroom Project

+61

112 neighbors recently requested a quote
Recommended by58%of homeowners
Avatar for Five Star Bath Solutions of Phoenix AZ
Five Star Bath Solutions of Phoenix AZ
5.0(
66
)
Bathroom - RemodelBathtub Install or ReplaceBathtub Liner or Shower Surround - Install or Replace

Serving Glendale, AZ and surrounding areas

Approved

Super Service Award Winner

In business since 2023

Free estimates

Warranties offered

"I really would rate this company over five. We were fortunate to work with Glade. Due to a misunderstanding the wrong glass was installed and as soon as I brought this to Gladeâ s attention he reordered and replaced new glass enclosure. So pleased to work with honest and caring people. Always get a quick phone response which is a bonus. Love our new showerâ £ï¸ Happy customers, Bobbi and David"
Shower
Shower
Vanity
Bathroom Remodel
Large shower conversion

+47

Response time5 hrs
Response rate100%
427 neighbors recently requested a quote
Avatar for Home Renovations of Arizona
Home Renovations of Arizona
5.0(
13
)
Bathtub Install or Replace

Serving Glendale, AZ and surrounding areas

Approved

Super Service Award Winner

In business since 2022

Free estimates

Warranties offered

"Home Renovations of Arizona came out to give me a quote on remodeling my master bathroom shower. Doug Parks walked me through all my options and answered all my questions. I felt very comfortable choosing them and as the right decision. Issac, who kept me up to date on the status of my project, was friendly and professional. Kyle did the instal and was also very friendly and did an outstanding job! My new shower is absolutely beautiful and I’m so grateful I went with them. I will definitely be going back to them with future renovations."
Walk-in Tub
Shower
Response time5 hrs
Response rate98%
58 neighbors recently requested a quote
Avatar for West Shore Home Phoenix
West Shore Home Phoenix
4.5(
90
)
Bathroom - RemodelBathtub Liner or Shower Surround - Install or ReplaceBathtub Install or Replace

Serving Glendale, AZ and surrounding areas

Approved

In business since 2006

Free estimates

Credit card accepted

"Q and Jordan removed my bathtub and installed a beautiful new shower. These gentlemen kept it clean and finished in a timely manner. Definitely recommend this company to anyone looking to remodel their bathtub or update their shower"
After
Before
After
Before
After

+4

406 neighbors recently requested a quote
Recommended by93%of homeowners
Avatar for Alba Construction
Alba Construction
4.8(
27
)
Bathroom - RemodelBathroom - Remodel - For BusinessBathtub Install or Replace+1 more

Serving Glendale, AZ and surrounding areas

Approved

In business since 2001

Free estimates

Warranties offered

"Wow we were so impressed with this company! Very responsive, efficient & impressive work for our bathroom reno. From demo to completion done in 2 weeks. We’d definitely hire again for any future construction needs!"
Master Bathroom Shower/Tub to Walk-In Shower Remodel
Kitchen Remodel
Kitchen/Flooring Remodel
Tub to walk in shower remodel
Media wall design and build

+82

Response time1 day
6 neighbors recently requested a quote
Recommended by96%of homeowners
Avatar for Handyman Connection - Phoenix
Handyman Connection - Phoenix
4.6(
1,831
)
Bathroom - RemodelBathtub Install or ReplaceBathtub Install or Replace - For Business

Serving Glendale, AZ and surrounding areas

Approved

Super Service Award Winner

In business since 1995

Warranties offered

Credit card accepted

"Based on my previous positive experiences with Handyman Connection, I contacted them about repairing three unrelated issues: (1)water damage to the fascia of my recently built carport; (2) the repair of the latch on a backyard gate; and (3) the installation of a replacement ceiling fan. The work was scheduled after an initial visit and price quote, and I have to say that the whole experience of working with Greg H. was great. Greg assumed the responsibility of purchasing the necessary parts, which alone saved me the time I would have wasted making trips here and there only to come back with a wrong item or two, or the time I might have wasted going back for some part I didn't know I’d need at all. What’s more, what I assumed would be a two day job was completely finished in less than one day, and the quality of Greg's work was excellent. As I indicated earlier, I’ve used Handyman Connection in the past, and Greg definitely gave me reasons to continue using them in the future; I highly recommend Handyman Connection for your next repair or project.10"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+16

Response time1 day
Response rate85%
33 neighbors recently requested a quote
Avatar for Leaf Home Bath
Leaf Home Bath
4.2(
27
)
Bathtub Install or Replace

Serving Glendale, AZ and surrounding areas

Approved (Corporate)

In business since 2018

Free estimates

Credit card accepted

"Great presentation by Nick. Very nice, informative, professional and knowledgeable. Super quality products and vert6competitive pricing. Because of very busy installation schedules, it will take 4-6 weeks before walkin shower remodel can happen. We can wait, no problem. It will be worth it."
Brand Name
Recommended by72%of homeowners
...
Showing 1-10 of 536
Bathtub Replacement questions, answered by experts

The most common type of tub is the alcove; most bathtubs are shower and tub combinations. Many suburban homes feature these as the default option because they allow the flexibility for users to take a bath or a shower—a notable benefit for those with pets and young kids.

A peeling bathtub is not a good thing. It’s a sign that the finish is coming off, and continued exposure to water and cleaning products can continue to damage the finish and eventually the underlying structure of the tub. What starts as a few chips or flakes can worsen into large chunks peeling off.

A professional bathtub installation or replacement typically takes one to three days, depending on the project's complexity and any necessary alterations. If you hire a professional, most replacements can be completed in one to three days. However, if you choose the DIY route, the process could take up to a month, as it involves removing the old tub and drywall, installing the new tub, repairing the drywall, and installing new tiling.

The time it takes to install a bathtub depends on the type of tub, the condition of the existing plumbing, and the installation's complexity. A new bathtub can be installed in four to eight hours. However, this can take longer if any additional plumbing work or bathroom modifications are needed.

Installing a clawfoot tub with a minimum of 6 inches of clearance from surrounding walls allows ample room for the faucet and pipework, makes cleaning easier, and reduces the chance of moisture being trapped between the tub and the walls. It might need to be closer if the faucet comes directly out of the wall.

The Glendale, AZ homeowners’ guide to bathtub replacements

From average costs to expert advice, get all the answers you need to get your job done.