Top-rated contractors.

Get matched with top contractors in Fort Smith, AR

Enter your zip and get matched with up to 5 pros

Need a pro for your contractor service project in Fort Smith, AR?

Select your specific project to find the pro for you.

TRUSTED BY FORT SMITH, AR HOMEOWNERS

  • Average homeowner rating star icon5
    Average homeowner rating
  • Verified reviews icon12
    Verified contractor services reviews

Find Contractors in Fort Smith

Avatar for Edwards Painting Company
Edwards Painting Company
4.8(
5
)

Serving Fort Smith, AR and surrounding areas

Free estimates

"They came in did a beautiful job, and they did it in a very professional way. I couldn’t be more happy with the results of my remodel. Very friendly individuals that know what they’re doing. If I could rate them I’d be giving them a 10/10 hands down best of their trade."
Before
Before
Before
Before
After

+12

Recommended by100%of homeowners
...
Showing 1-10 of 51
Unfinished Carpentry questions, answered by experts

Modern brick houses are really stick-built homes with a brick facade for aesthetic purposes only, so most have framing. With genuine brick construction, most homeowners install furring strips over the interior of the brick and then install drywall over those strips to cover the brick wall, so they don’t have traditional framing.

Metal stud framing parts include the studs themselves, upper and lower tracks that act as top and bottom wall plates, various angle fasteners and clips, screws for fastening pieces togeher, metal straps, c-channel supports, and thicker steel supporting structures. Roof framing metal components include pre-fabricated trusses, heavy-gauge stud pieces, and various plates and fasteners.

Framing most homes takes anywhere between five and eight weeks to complete. You’ll need to account for inclement weather conditions, material shipment times, the number of crew members, and the weight of your materials. If the weather is too hot, wet, or cold for the installation, this process could take closer to eight weeks.

Baseboards don’t have to be nailed into studs. However, nailing them into studs adds to their stability. When studs aren’t available, you can secure them with drywall nails directly into the drywall and adhesive. Always aim to nail into studs, especially in high-traffic or impact-prone areas.

Not all porch columns are load-bearing, though they can be. Some porch columns are simply decorative. There are ways to identify a load-bearing column, like looking for visible seams and a foundation. Also, check to see if the column directly enters the ground. In some porch installations, a contractor will excavate a hole to install a column into the earth along with a buried cement base for stability.

The Fort Smith, AR homeowners’ guide to contractor services

From average costs to expert advice, get all the answers you need to get your job done.