Top-rated basement remodelers.

Get matched with top basement remodelers in Chugiak, AK

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Chugiak, AK?

Select your specific project to find the pro for you.

TRUSTED BY CHUGIAK, AK HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon16
    Verified basement remodels reviews

Find Basement remodelers in Chugiak

Avatar for 84th Street Construction
84th Street Construction
4.4(
23
)
Basement - Remodel

Serving Chugiak, AK and surrounding areas

Approved

In business since 2007

Warranties offered

Small jobs welcome

"I am a repeat customer, first they replaced all may windows and sliding glass doors with all triple pane - AWESOME job! They just fixed my upstairs 2nd floor exterior deck supports - main boards that went into house under outer wood panels had started to dry rot - very dangerous, replaced deck supports, outer panel, painted everything to match exterior paint and I'm a very happy camper! Just like a plumber, mechanic or even a dentist, a great contractor you can depend on is a treasure! Won't go wrong with 84th Street Construction!"
Living Room With A View
Finished Exterior
Front Door
Master Bath Jetted Tub
Master Bath Walk-in Shower

+25

Response time2 days
1 neighbors recently requested a quote
Recommended by100%of homeowners
Happy Valley Construction & Design
5.0(
7
)
Basement - Remodel

Serving Chugiak, AK and surrounding areas

Approved

In business since 1980

Free estimates

Offers commercial services

"I’ve had this company do a huge home remodel, a condo remodel, hot tub install, mother-in-law dwelling remodel and a number of other projects. My absolute “go to” for anything. Never found a problem that couldn’t be solved. I’ve recommended them to friends who all have done remodels, small jobs and even a rebuild after a fire. Ask them for my reference and call me directly if you want. I can’t say enough good about Butch and his folks. Superb!!"
4 neighbors recently requested a quote
Recommended by42%of homeowners
Avatar for GP Construction, LLC
GP Construction, LLC
4.2(
43
)
Basement - Remodel

Serving Chugiak, AK and surrounding areas

In business since 2016

Free estimates

Credit card accepted

"We highly recommend GP Construction. Their customer service and work ethic is outstanding. All the guys who did work on our kitchen remodel were courteous, professional, knowledgeable and skilled. They cleaned everything up really well at the end of each day and were very considerate of our having to live among the construction. Marty was our project manager. He works hard to make sure everything is done to his high standards, and he is very patient with new ideas and changes. He is amazing! We will be using them for all future projects."
Kitchen Remodels
Kitchen Remodels
Kitchen Remodels
Kitchen Remodels
Kitchen Remodels

+20

Response time2 days
Recommended by87%of homeowners
...
Showing 1-10 of 67
Basement Remodel questions, answered by experts

Create a checklist, reimagine the space use, set a realistic budget, choose materials and aesthetic details, and get professional support for guidelines and troubleshooting.

Renovation enhances functionality, increases home value, and can add new space for personal or family needs. It typically modernizes older unfinished basements for new uses.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The best type of basement ventilation system depends on your budget, the moisture in your basement’s air, and the types of windows you have down there. You should consider all of these factors when choosing a ventilation system. However, the most effective method for basement ventilation is an energy recovery ventilator (ERV) or a whole-house ventilation system, which preheats or precools incoming air from the outside while also managing water vapor.

The Chugiak, AK homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.