Top-rated basement remodelers.

Best basement remodelers near Wasilla, AK

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Wasilla, AK?

Select your specific project to find the pro for you.

TRUSTED BY WASILLA, AK HOMEOWNERS

  • Average homeowner rating star icon4.9
    Average homeowner rating
  • Verified reviews icon16
    Verified basement remodels reviews

Top-Rated Basement remodelers in Wasilla - Updated Nov 2026

Avatar for L P Services
L P Services
4.6(
52
)
Basement - Remodel

Serving Wasilla, AK and surrounding areas

Approved

In business since 2017

Free estimates

Customers say: Quick response

"LP Services repainted the exterior of our house and did a good job. Price was competitive and the workers were friendly and efficient. They did some extra touch-up in a few places to make sure we were happy with the final product."
Response time1 day
11 neighbors recently requested a quote
Recommended by86%of homeowners
Avatar for Rizer Contracting LLC
Rizer Contracting LLC
5.0(
3
)
Basement - Remodel

Serving Wasilla, AK and surrounding areas

Approved

In business since 2020

Free estimates

Credit card accepted

"He is trustworthy, honest, and easy to work with. He sends regular invoices. He can be reached by phone easily six days a week with questions. He provides good advice."
My jobs
My jobs
My jobs
My jobs
My jobs

+17

Response time7 hrs
5 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Crestone General LLC
Crestone General LLC
4.7(
23
)
Basement - Remodel

Serving Wasilla, AK and surrounding areas

In business since 2006

"

My initial contact with Jim Burke, of Crestone General was pleasant, informational, and uplifting.  Mr. Burke informed me that his company usually does commercial projects; however, because I was in need of a good contractor to remodel two bathrooms into a handicapped accessible bathroom, he made the decision to bid on and do the project.  He took into account the situation in which I'd found myself following my father's severe stroke, and the fact I wished to get my father discharged from the transitional rehabilitation center and home as soon as possible.

Mr. Burke, his employees, and the subcontractors were very professional, punctual, and polite.  They arrived on time each morning and worked hard throughout the day, stopping only for a lunch break.  Prior to beginning the demolition portion of the job, they laid down heavy plastic in the hallways, on the stairs, in the bedroom adjacent to the bathroom, and on the bathroom floor downstairs as well, to insure the cream-colored carpeting did not get stained or dirty  I was quite surprised and pleased that they took the time to clean up after themselves, including daily cleaning of the large rug in the entry of our home, sweeping of the floor in the new bathroom, sweeping out the garage, and disposing of any trash on a daily basis.  Additionally, upon completion of the project, they even cleaned the new bathroom from top to bottom for me.

The plan for the bathroom was a work in progress and although an initial design was provided, Mr. Burke and his subcontractors worked with me, respected my wishes, and several redesigns were done during the project.  Ideas were passed back and forth, suggestions made, and at all times I was treated with the utmost respect and consideration. 

The finished bathroom is one which anyone would be extremely proud and pleased to have in their home.  It adheres to ADA specifications, and is lovely in appearance. The shower stall is large and roomy and the floor is sloped so well that the water drains perfectly, not even getting the floor outside of the stall damp. In fact, when the nursing supervisor for Providence Home Health came by to check on my father, she stated:  "This is my dream bathroom!". 

I highly recommend Crestone General and will continue to call upon this company to do additional projects for me in the future.




"
Recommended by94%of homeowners
Avatar for Olrun Construction
Olrun Construction
5.0(
8
)
Basement - Remodel

Serving Wasilla, AK and surrounding areas

In business since 2022

Free estimates

Credit card accepted

"These guys were super helpful in explaining what was best for me with the best price. They were very professional and quick to respond. Would give a 10 star if I could. Best in anchorage"
Deck
Bathroom
Window
Handrail
Logo

+4

Response time4 days
Recommended by100%of homeowners
Avatar for High Level Construction
High Level Construction
4.6(
14
)
Basement - Remodel

Serving Wasilla, AK and surrounding areas

In business since 2000

Free estimates

Small jobs welcome

"Very professional, knowledgeable and easy to work with. Treats my project as if it were his, paying close attention to detail and quality workmanship. I would not hesitate to recommend Jamie for any job!"
Large home remodel
Large home remodel
Large home remodel
Large home remodel
Large home remodel

+64

Response time1 day
Recommended by100%of homeowners
Avatar for TW Roofing Group LLC
TW Roofing Group LLC
5.0(
9
)
Basement - Remodel

Serving Wasilla, AK and surrounding areas

In business since 2018

Free estimates

Emergency services offered

"Tw roofing is very professional. They worked quickly and cleaned up after the job was done. The roof came out so nice that I had them do the trim around the house and that turned out excellent! it made the house look like an over all remodel."
Anchorage Alaska roofing
New roof/re roof
New roof/re roof
New roof/re roof
New roof/re roof

+24

Recommended by100%of homeowners
Avatar for GP Construction, LLC
GP Construction, LLC
4.2(
43
)
Basement - Remodel

Serving Wasilla, AK and surrounding areas

In business since 2016

Free estimates

Credit card accepted

"We highly recommend GP Construction. Their customer service and work ethic is outstanding. All the guys who did work on our kitchen remodel were courteous, professional, knowledgeable and skilled. They cleaned everything up really well at the end of each day and were very considerate of our having to live among the construction. Marty was our project manager. He works hard to make sure everything is done to his high standards, and he is very patient with new ideas and changes. He is amazing! We will be using them for all future projects."
Kitchen Remodels
Kitchen Remodels
Kitchen Remodels
Kitchen Remodels
Kitchen Remodels

+20

Response time2 days
Recommended by87%of homeowners
...
Showing 1-10 of 66
Basement Remodel FAQs, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Since DIYing a basement remodel isn't typically advised, there are some ways that you can still save money on this project without putting yourself in danger. Some ways to save money on a basement remodel include:

  • Painting walls yourself versus including in the cost of the remodel 

  • Installing light fixtures yourself

  • Choosing prefabricated fixtures, like cabinets, over custom ones

  • Choosing a budget-friendly flooring option, like laminate or vinyl flooring, and add rugs where necessary

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Yes, it is possible to turn a regular basement into a walkout basement. Doing so involves excavating the land around at least one side of your basement foundation, installing retaining walls to create a permanent below-grade area outside your home, and then cutting into the foundation to install an exterior door that leads out to the new space. This is an expensive and time-consuming project, but it can add a lot of value and utility to your home.

Envision the type of bar experience you'd like to create for your guests. For example:

  • Does your basement have enough finished space for bar stools or seating?

  • What type of additional lighting would set the tone for the room?

  • Are there basement windows or an HVAC system?

  • Do you need new plumbing in your basement for a proper wet bar?

  • Could you be happy with a built-in wall cabinet bar rather than a full-scale wet bar?

The Wasilla, AK homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.