Top-rated paving pros.

Get matched with top paving pros in Osseo, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your paving service project in Osseo, WI?

Select your specific project to find the pro for you.

Find Paving pros in Osseo

Tru-Cut Lawn & Landscape
4.1(
11
)
Interlocking Pavers for Patios, Walks & Steps - Install

Serving Osseo, WI and surrounding areas

In business since 2012

Free estimates

Credit card accepted

"h got the job done within a narrow window of time between the rain and their other projects. Though our project was small , they did it anyway. The only question we have is why they didn't install the border liner like they said they would. Don't know if they are done or not. We paid half done but haven't received a bill yet."
Response time2 days
Recommended by100%of homeowners
Showing 1-10 of 29
Paving Services questions, answered by experts

Driveways should be sloped with a minimum 2% slope—anything lower will cause precipitation and runoff to collect. A 2% slope is the equivalent of a 2-foot rise over 100 feet. One quick way to check the integrity of your driveway’s slope: no more than four inches of water should collect on the surface longer than 15 minutes after rain.

You’ll first need to install a base underneath your pavers for extra stability and drainage. Otherwise, the pavers can sink into the ground, and you’ll have to reinstall them. Use a base gravel layer of 4 to 6 inches for walkways and 10 to 12 inches for driveways. Compact your gravel layer every 2 to 4 inches so it’s nice and solid. After you install your gravel base, apply a 1-inch layer of sand on top.

Yes, you should lightly wet the sand with a hose before laying the pavers on top. This activates the bonding agents in the sand, ensuring that your pavers don’t shift around during the installation process. However, you should make sure that the sand is not soaked; overwatering can cause the sand and pavers to not set properly.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

If you notice minor cosmetic problems with your driveway, you should seal it. Look out for cracks and holes on the surface, faded asphalt or concrete, and stains from oil and other chemicals. Replacing your driveway may be necessary if you’re dealing with significant problems—¼-inch cracks, large potholes, and puddles from drainage issues. The cost to install an asphalt driveway typically ranges between $4,200 and $9,000, significantly more than resealing. Consider talking to a professional to discuss whether resurfacing your driveway—a midway project between resealing and replacing—is a better option for you.

The Osseo, WI homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.