Top-rated paving pros.

Best paving pros near Boyd, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your paving service project in Boyd, WI?

Select your specific project to find the pro for you.

Top-Rated Paving pros in Boyd - Updated Nov 2026

Showing 1-10 of 24
Paving Services FAQs, answered by experts

Recycled asphalt is a durable choice for a driveway, but doesn’t have the same appearance and low maintenance as standard asphalt. For long driveways in rural communities, recycled asphalt can make a great choice. Recycled asphalt is 20% to 30% percent less expensive than standard asphalt and is better for the environment. 

The recommended minimum amount for a paver base is 4 inches. From there, it depends on the kind of traffic the pavers will see and the current soil conditions. Two inches of paver base won’t create the amount of stability and support that pavers need to remain securely in place over time.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

Depending on project size, typically 1 to 3 days, including preparation and installation.

After removing existing moss, consider using paver blocking sand to fill the joints. This specialty material hardens once placed and serves as an effective barrier against moss and weeds. From there on, regularly clean your pavers and try to keep them dry. You can also seal your paver as a semi-permanent solution — just make sure you reseal every 3 to 5 years.

The Boyd, WI homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.