Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Monticello, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Monticello, WI?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Monticello

Avatar for JC Premier Seal
JC Premier Seal
4.5(
96
)
Asphalt Sealing

Serving Monticello, WI and surrounding areas

Approved

In business since 1998

Free estimates

Emergency services offered

"Jason was excellent about returning messages and arrived 15 minutes early. He took his time to answer my questions and was very professional and courteous. Work was completed within stated timeframe and the driveway looks great!"
Asphalt parking lot maintenance
Asphalt sealing commercial property
Asphalt line marking
Additional Photos
Additional Photos

+18

Response time1 day
Response rate100%
1 neighbors recently requested a quote
Avatar for Apex Asphalt Solutions LLC
Apex Asphalt Solutions LLC
5.0(
2
)
Asphalt Sealing

Serving Monticello, WI and surrounding areas

Approved

In business since 2023

Free estimates

Offers commercial services

"Full disclosure, the original job left some areas poorly coated but they came back within 2 days and properly finished the job. The young guys that did the work were very friendly and courteous. I highly recommend!"
Sealcoated driveway by broom
Asphalt maintenance
Cracksealer
Broom
Broom

+6

Response time1 day
Response rate100%
3 neighbors recently requested a quote
Avatar for R & A Concrete, LLC
R & A Concrete, LLC
5.0(
1
)
Concrete Driveways & Floors - Install- For Business

Serving Monticello, WI and surrounding areas

Approved

In business since 2021

Free estimates

Credit card accepted

OVER 10 YEARS EXPERIENCE!!!\n\nTOP RATED HOME ADVISOR PRO!!!\n\nWELCOME TO R & A CONCRETE LLC!!!\n\n\nWe take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs.\n\nIt is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner.\n\nOur reputation is based on service, safety, and quality, regardless of how large or small the job.

Backyard Patio
Before
Backyard Patio with Sod
Forming the Hot Tub Pad
Pad formed

+7

Recommended by100%of homeowners
...
Showing 1-10 of 63
Asphalt Driveways questions, answered by experts

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Recycled asphalt is not better than gravel, but can be a good alternative. It is inexpensive, but not as low-cost as gravel, and doesn’t tend to last as long. Recycled asphalt isn’t as dusty as gravel and is more environmentally friendly. The black look can be something that homeowners prefer. No matter what, ensure you choose an experienced recycled asphalt contractor. 

An ideal driveway gradient is between 2% and 5%. Anything lower than 1% or higher than 15% can cause problems for your car or property. A driveway with less than a 1% slope increases your likelihood of flooding and water damage, while a driveway with a 15% grade or higher can be too steep for safe traveling.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

A driveway approach is the part of a driveway where the public road meets the private driveway. This section contains several key elements, including the driveway apron, the curb cut, and the end slope. Depending on the slope of the driveway, this area may also contain the trench drain.

The Monticello, WI homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.