Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Monroe, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Monroe, WI?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Monroe

Avatar for R & A Concrete, LLC
R & A Concrete, LLC
5.0(
1
)

Serving Monroe, WI and surrounding areas

Approved

In business since 2021

Free estimates

Credit card accepted

"They came to the job a day early. Did a great job. Added curves to the concrete that I had not planned on that improve the appearance greatly. The whole crew was great to work with."
Backyard Patio
Before
Backyard Patio with Sod
Forming the Hot Tub Pad
Pad formed

+7

Recommended by100%of homeowners
Avatar for Hardscapes Built on Faith, LLC
Hardscapes Built on Faith, LLC
5.0(
9
)

Serving Monroe, WI and surrounding areas

Emergency services offered

"Great! Sean and Brad showed up at 8:00 a.m. and got right to it. They listened to what I wanted and made suggestions on the best way to do it. They know what they're doing and they have the equipment to do it right. I was impressed by their hard work and effort to make the job look great, so I've hired them to pour a second slab for me next week!"
Stamped patio
Elevated patio with step and sidewalk square
Tiered patio
Stamped patio
Heavy stone stamped patio

+27

Recommended by100%of homeowners
Showing 1-10 of 45
Asphalt Driveways questions, answered by experts

Sealing coat asphalt after 6-12 months and then every 2-3 years is recommended.

Asphalt dries and cures best between 50 and 85 degrees Fahrenheit. This range allows moisture to evaporate quickly without causing the asphalt to cool too fast, which can negatively affect the drying process. However, keep in mind that other weather conditions can also affect curing and drying times, such as precipitation and humidity.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

You should not attempt to install your own driveway. Whether working with asphalt or pavement, this is a complicated project that requires special equipment. Talk to some nearby asphalt or paving professionals and discuss your particular needs—it’s a good idea to get a few quotes and look at the company’s past work.

The Monroe, WI homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.