Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Evansville, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Evansville, WI?

Select your specific project to find the pro for you.

TRUSTED BY EVANSVILLE, WI HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon38
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Evansville

Avatar for JC Premier Seal
JC Premier Seal
4.5(
96
)
Asphalt Sealing

Serving Evansville, WI and surrounding areas

Approved

In business since 1998

Free estimates

Emergency services offered

"Jason was excellent about returning messages and arrived 15 minutes early. He took his time to answer my questions and was very professional and courteous. Work was completed within stated timeframe and the driveway looks great!"
Asphalt parking lot maintenance
Asphalt sealing commercial property
Asphalt line marking
Additional Photos
Additional Photos

+18

Response time1 day
Response rate100%
1 neighbors recently requested a quote
Avatar for Apex Asphalt Solutions LLC
Apex Asphalt Solutions LLC
5.0(
2
)
Asphalt Sealing

Serving Evansville, WI and surrounding areas

Approved

In business since 2023

Free estimates

Offers commercial services

"Full disclosure, the original job left some areas poorly coated but they came back within 2 days and properly finished the job. The young guys that did the work were very friendly and courteous. I highly recommend!"
Sealcoated driveway by broom
Asphalt maintenance
Cracksealer
Broom
Broom

+6

Response time1 day
Response rate100%
4 neighbors recently requested a quote
...
Showing 1-10 of 84
Asphalt Driveways questions, answered by experts

The answer to whether or not you need to get a permit before you start your driveway can vary widely based on local ordinances and the scope of your driveway ideas. In most urban and suburban areas, a permit is needed before building a new driveway to ensure that a homeowner is using safe materials and proper drainage practices while designing and constructing a new driveway. In some rural areas, a homeowner may not be required to apply for a permit. When building a new driveway on your own, always check with your local building department to see if you need to request a permit. When hiring a driveway contractor, verify that the right permits are being used before driveway construction begins.

Yes, you can retrofit an existing driveway, but this usually involves cutting grooves into the driveway, installing the heating elements, then sealing them. While this is much less expensive than typical heated driveway systems, the final appearance could be diminished. Speak with a driveway paving company to confirm which design method is best for you.

There’s no single best asphalt grade—it all comes down to where and how it’s used. Highways and heavy-traffic roads need something tough, like polymer-modified asphalt (PMA) or Stone Matrix Asphalt (SMA). Local roads and parking lots rely on the Performance Graded (PG) system, chosen based on climate. A PG 64-28 mix, for example, handles a broad temperature range while simpler, more cost-effective mixes are typically enough for residential driveways. The best grade of asphalt depends on traffic, weather, and your budget, which is why a professional’s input is always a smart move before making a decision.

An ideal driveway gradient is between 2% and 5%. Anything lower than 1% or higher than 15% can cause problems for your car or property. A driveway with less than a 1% slope increases your likelihood of flooding and water damage, while a driveway with a 15% grade or higher can be too steep for safe traveling.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Evansville, WI homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.