Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Deforest, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Deforest, WI?

Select your specific project to find the pro for you.

TRUSTED BY DEFOREST, WI HOMEOWNERS

  • Average homeowner rating star icon4.2
    Average homeowner rating
  • Verified reviews icon52
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Deforest

Avatar for JC Premier Seal
JC Premier Seal
4.5(
96
)
Asphalt Sealing

Serving Deforest, WI and surrounding areas

Approved

In business since 1998

Free estimates

Emergency services offered

"Great. Although Jason didn't come on the day he stated ( mixup on someone's part), he did an excellent job sealing our driveway. He thoroughly cleaned cracks before filling them. We have tried other companies in the past but JC has by far done the best job."
Asphalt parking lot maintenance
Asphalt sealing commercial property
Asphalt line marking
Additional Photos
Additional Photos

+18

Response time1 day
Response rate100%
1 neighbors recently requested a quote
Avatar for Alonso Landscape Service LLC
Alonso Landscape Service LLC
4.2(
74
)
Concrete Driveways - InstallBrick and Stone Driveways & Floors - InstallConcrete Driveways & Floors - Install- For Business+1 more

Serving Deforest, WI and surrounding areas

Approved

In business since 2007

Free estimates

Emergency services offered

"Mr. Alonso was very personable and sent the bid within 1/2 hour of his visit to prepare the estimate. The price was midway between the least and most expensive bids. Both my husband and I understood that after Alonso leveled the surface, a base would be laid prior to installing the flagstone pavers. Mr. Alonso said that the earliest they could come was September. In fact, he contacted me in July, saying the crew could come the next day, Saturday, July 18. Great! It was a hot day, but the crew, under foreman Jesse, worked hard and fast, moving the flagstone from the driveway to the shady area in the back of the house. They leveled the surface, placed the stones directly on the surface, shoveled some of the scraped soil between the pavers, and hosed everything down. When I asked the foreman about the base, he said, "No, that's not the way we do it. The flagstones will settle into place." After they left, I checked Alonso's estimate again, and there was no mention of laying a base. The workmen had done a neat job and filled the specified length and width over the bare dirt. My husband transplanted moss from other parts of the yard into the gaps between the attractive flagstones. But within two weeks, five of the flagstones became wobbly, and I worried about safely walking on the stones after dark. When Alonso’s learned of my concerns, Jesse came like a flash and re-laid the wobbly flagstones. Jesse explained that the firm lays a gravel base for areas where no plant life is desired, and that the stones will settle better into the bare dirt with additional rain."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+40

Response time1 day
Response rate100%
7 neighbors recently requested a quote
Avatar for Boulders Concrete and Construction LLC
Boulders Concrete and Construction LLC
4.4(
20
)
Concrete Driveways - InstallConcrete Driveways & Floors - Install- For Business

Serving Deforest, WI and surrounding areas

Approved

In business since 2020

Free estimates

Offers commercial services

"Tedroy removed the old sidewalk and prepared it well, using a kind of steel reinforcement bars (not regular highway rebars, which are heavier than necessary for a sidewalk, I think). I didn't see him pour the concrete, but he smoothed it out and shaped the edges nicely. Then he brushed it to improve winter traction."
1 neighbors recently requested a quote
Recommended by89%of homeowners
...
Showing 1-10 of 110
Asphalt Driveways questions, answered by experts

The material that’s best for your private road depends on your property, the climate in your area, and your personal preferences. Gravel is an affordable option, but some homeowners don’t like how it looks. It can be a pain to remove snow from, and it requires more ongoing maintenance than asphalt or concrete. However, while these other options require less maintenance and make snow removal a breeze, they’re more expensive and will need repairs from time to time. Ultimately, you’ll have to choose the road material that suits you and your property best.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

An ideal driveway gradient is between 2% and 5%. Anything lower than 1% or higher than 15% can cause problems for your car or property. A driveway with less than a 1% slope increases your likelihood of flooding and water damage, while a driveway with a 15% grade or higher can be too steep for safe traveling.

In the United States, roads are usually categorized as one of three types: public roads, other drivable roads, and non-drivable roads. These categories dictate how a road can be used; a non-drivable road might be classified that way because it is heavily damaged and unsafe for cars.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

The Deforest, WI homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.