Top-rated glass block pros.

Get matched with top glass block pros in Rainier, WA

Enter your zip and get matched with up to 5 pros

Need a pro for your glass block service project in Rainier, WA?

Select your specific project to find the pro for you.

Find Glass block pros in Rainier

Avatar for First Choice Grout & Tile
First Choice Grout & Tile
4.5(
75
)
Stained or Specialty Glass - Repair

Serving Rainier, WA and surrounding areas

In business since 2003

Free estimates

"Adrian was fantastic. We were very impressed. The work was done in a very good timely manner and looks really good, far exceeded our expectation. First Choice Grout and Tile, Adrian, will be our first call when we decide to remodel our main bathroom or any other like work. Thank you, Noeline"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Smaller Custom Tiles

+10

Recommended by85%of homeowners
Avatar for Honeycomb Construction
Honeycomb Construction
4.8(
40
)
Glass Blocks - InstallGlass Blocks - Install - For Business

Serving Rainier, WA and surrounding areas

In business since 2019

Free estimates

"I was recently seeking a contractor on Angi for an urgent interior paint project at my home with quick turnaround time. This bedroom paint project included wall paint (2 colors; 1 accent wall), wall baseboard trim repair + paint, door trim repair + paint, door paint, and a plumbing panel replacement + paint. When I posted the request on Angi, Eugene from Honeycomb Construction called me within a minute after posting (Wow!). I explained my situation (baby on the way/arriving in weeks, nesting) and project details, and Eugene stopped by the same day to get a good look at room needing paint + repairs. Eugene was able to meet my familyâ s needs to get this room ready within one week. Although the estimated job timeline slid out by one day due to factors out of Eugeneâ s control (cold room on the basement floor, so paint takes longer to dry between coats), he did an excellent job with all the promised work: the paints of coat were even and full, the lines between the two colors of paint were crisp and clean, and the baseboard trim was looking sharp! Eugene does great work, heâ s really responsive and communicative throughout the process, heâ s really professional, and he is very kind. I will be hiring Eugene and Honeycomb Construction again for future home projects. Thank you!"
exterior
exterior
exterior
exterior
exterior

+32

Response time1 day
Response rate86%
Recommended by97%of homeowners
Puget Sound Stone Repair dba Edmonds Tile & Stone
5.0(
9
)
Glass Blocks - InstallGlass Blocks - Install - For Business

Serving Rainier, WA and surrounding areas

In business since 2004

Free estimates

Emergency services offered

"Todd is really easy to work with. He worked around our schedule. While doing the work our house stayed very clean and each time we came home it was essentially as if they were never there. The tile guy took 12 x 12 marble tile and cut, honed, and polished it into our specified dimensions. Todd also was able to creatively work around a few of our house's quirks. He does not have a plumber that he works with so we did have to get our own plumber which ended up costing us quite a bit. Overall, a painless kitchen redo for a reasonable price and fantastic results!"
Recommended by100%of homeowners
Avatar for Kitchen Design Center Ltd
Kitchen Design Center Ltd
4.5(
37
)
Glass Blocks - InstallGlass Blocks - Install - For BusinessStained or Specialty Glass - Repair

Serving Rainier, WA and surrounding areas

In business since 1991

Free estimates

Credit card accepted

"When giving me a quote, I told Ron that I had rec'd a quote for $35,000 just to remove the walls. I believe that person just didn't want the job for wahtever reason -- but Ron came along and when I said "I had a dream for my kitchen that included removing the walls, etc.," and he said he could make my dream come true. Where once there was no space, we have made a comfortable way to seat 14 people. Where we once had a kid's table, we have an adults bar area.... except, lo and behold, the kids all way to sit at the bar. In addition to the bare bones description, Ron, Amy, and Candy were amazing to work w/. To be able to do the job for that much less, Ron figured out ways I could do some of the work myself and make it happen. His advice for how to change my kitchen around were all spot on, from the suggested new sink stopper -- the fact that, w/ only a small bit of cupboard space for pots and pans near my stove (the others being stored in the island), I had to decide which pans were my "favorites." Following his advice, I was able to make it all work. What used to be a 4 foot square space between stove and the arch to the dining room area is now wide open. Before the change, family used to come in, skip through the kitchen to the family/TV room - or if anyone was to keep my company while I cooked, they'd need to sit on the counters - taking away necessary prep space. From the first day of completion, forward, my family of 13 have asked to have all celebrations at my home. The flow, the warmth, the whole ambiance of my home has hanged. Gleefully, if too much time passes, family sometimes forgets I've had it remodeled and are surprised anew when they walk in. What's most amazing is that talking to one another in that family room was often interrupted by TV shows, etc. Now, most people walk in and seat themselves at the island. Family is more engaged, dining is much easier -- I can set up a buffet line on one half of the island and still allow the five to eat from the other side. I would heartily recommend Kitchen Design Center to anyone w/ a dream of a kitchen that they think just can't be done. You may have to pitch in some elbow grease buy Ron, Amy, and Candy can help you with suggestions and their experience."
Wide view of main kitchen space.
Lacey house, complete interior remodel.
Small offset island for breakfast nook and socializing.
Lacey house, complete interior remodel.
Cabinet installation in progress.

+55

Recommended by84%of homeowners
Avatar for JD BERGEVIN HOMES
JD BERGEVIN HOMES
4.3(
19
)
Glass Blocks - InstallGlass Blocks - Install - For BusinessStained or Specialty Glass - Repair

Serving Rainier, WA and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"TLDR; Driving progress is up to you.  Painter is incompetent.  Will miss every deadline.  No green building acumen.
  I hired Joe to add a bedroom to my house and pour a concrete pad for another room.   It was a straightforward project he estimated would take 2.5 months (10/1-12/15).  He volunteered the 12/15 completion date so I put fines in the contract if substantial work was not completed by 12/25.  From the architectural drawings, the only thing that changed during the project was the size of one window and the additional removal of a 3 foot interior wall.
  10/1, the work started and within the first two weeks, excavation was done, the foundations were poured, the framing was done and the windows and trusses were ordered.  Within a month the trusses and roof were on and the windows were installed.  So far, so good, but this was all done by one sub.
  Then things started going in slow motion.  I moved out for the month of November so they could get the dusty indoor work done without disturbing my family.  There were only 3 things completed in November, the electrical was roughed in, two small (5 foot and 3 foot) non-load bearing walls were removed and there was a day or two of digging on a retaining wall.  Disappointed in the progress I asked him twice for a schedule with the remaining tasks and dates.  Although he said he could provide one, he never did.
  He was supposed to have the drywall and insulation done by December 1st (a date again volunteered by him), so my HVAC contractor could install a ductless heat pump.  I had to push out that date by 2 weeks.  Also due to him missing the schedule, I was heating an uninsulated room for 3 days.
  For the siding, outsulation and exterior window trim, he set up 3 meetings to go over it with my architect.  The first one, the sider didn?t show.  I wasn?t around for the 2nd one.  The third time he sent a sider who had never worked with outsulation before.  To his credit, he paid for the 3rd meeting.  Although the architectural drawings went into explicit detail, the sider required handholding to understand them.  My architect was visibly frustrated explaining the installation process to him over the language barrier.   The sider charged $8000 for 4 days of work.  It was $2900 over Joe?s original bid.   This seemed high for 2 reasons.  1. A bid from a competitor who specialized in green building, had worked with my architect before and was familiar with outsulation bid $5600.   2. When I asked the sider why the caulk job was so bad, he revealed he had used a random day laborer to help.  When I asked Joe about the price, he stated that the price was fair because there were several surprises, and he had asked the sider to come down in price.  Not buying this explanation, I called the sider myself.  I asked him if he had provided Joe with a bid before he started working and he said no.  I asked him if Joe had asked him to come down in price and he said no.  So Joe essentially wrote him a blank check with my money.
  By the beginning of January, electrical still hadn?t been hooked up, there were no doors or gutters and the porta-potty and trash heap remained.  I?d had enough of Joe?s work and I wanted him to tie up the loose ends, give me the final bill and get out.  I handled all of the interior work, hanging the doors, doing the trim, painting, patching the drywall and installing the flooring to wrap this up as quickly as possible.  Unfortunately, after the initial bit of electrical was done on 1/6/15, I stopped the fines.  Joe went back into slow motion.  I?ve attached a full timeline so you can get a taste of this.
  Probably the biggest debacle of the project was the exterior painting.  I had told Joe I wanted to have him do the exterior painting, but I wanted it done when the weather was nice.  Ignoring my request, his guys came out to paint on 1/15/15. It was sprinkling when they arrived, but they shrugged it off with ?It wasn?t raining in Federal Way.?  More and more rain kept coming, so they covered their sprayer to protect it while they continued painting.  Then it started a downpour.  All the paint washed off.  They returned the next day to continue.  It rained again that day.  They didn?t prime any of the bare wood and painted it while it was soaking wet.  Not surprisingly, very little of it adhered to the wood.  I fired the sub in charge of the painters because he was supposed to do some work inside like hanging the doors and doing trim work and I didn't want him trashing my house any more. They came out again to paint, this time it wasn?t raining.  But the paint job looks terrible.  There remain bubbles, drips, uneven coloration and almost bare wood in places.  (There is one picture from the first day and all the remaining are as it looks today) I told Joe to hold payment for this until they did it right.  Joe has repeatedly told me he would make it right, but hasn?t delivered.  I scheduled a meeting with the painters to come out and review their work, but they never showed.  Also telling is Joe didn?t look at the paint job himself when he came to collect the final payment.
  Twice during the project I was approached by his subs asking for money.  Although I paid Joe the day he asked, it was clear there was a considerable delay with money flowing to his subs.  First the concrete guy showed up at my door and I got a lien notice from the company, the second was the door guy.  The door guy said, it takes a long time for Joe to pay.  It took over Joe over 2 months after his last day to collect the invoices and present me with the final bill.
  Something as simple as grading a 20 foot driveway and hauling out the trash, spanned 2 weeks to complete.  The worker trashed the retaining wall and left a bunch of concrete debris which I had to get hauled out myself (see picture).  Also of note, my circular saw mysteriously disappeared after the driveway guy used my table saw.
Here is the timeline:
Before work starts pay 1/3
10/1 Project and excavation starts
10/7 Concrete pads poured
10/10 Room, framed and sheathed
10/17 Trusses on
10/25 Roof on
10/31 Windows in
11/4 Pay second 1/3
11/5 Retaining wall digging starts
11/10 Remind Joe I need the insulation and drywall done by 11/30 for a scheduled HVAC install.
11/11 I provided my door choices to order.
11/12 Rough in of electrical
11/20 Small interior walls removed
11/23 Retaining wall ordered
11/25 Retaining wall arrives
11/28 Checked on doors, still hadn?t been ordered.
12/1 I return to my home and there is no drywall or insulation.
12/3 Insulation is done
12/9 Drywall starts
12/12 Drywall is done
12/13 Retaining wall digging ends
12/15 They come out to look at siding with architect
12/16 Retaining wall done
12/17 Doors actually ordered
12/19 Siding starts
12/22 Doors supposed to arrive
12/24 Siding done
1/6/15 Electrical finish starts
1/7/15 Asked to grade the driveway and finish up
1/10/15 Gutters on
1/15/15 Awful paint job done in the rain
1/16/15 Bare wet wood painted without priming, doors come in, wrong size
1/17/15 Driveway grading starts
1/20/15 Paint job touched up but not fixed, barely painted wood, bubbles, drips, uneven coloration remains
1/21/15 Electrical finish completed
1/26/15 Doors finally come in the correct size
1/27/15 Driveway graded
4/6/15 Get and pay final bill
4/18/15 Schedule painter 4/24 to review work
4/24/15 Painter doesn?t show up
"
Recommended by71%of homeowners
Avatar for RICMAR LANDSCAPING AND EXCAVATIONS LLC
RICMAR LANDSCAPING AND EXCAVATIONS LLC
5.0(
3
)
Glass Blocks - InstallGlass Blocks - Install - For Business

Serving Rainier, WA and surrounding areas

In business since 2022

Free estimates

Credit card accepted

"Ricardo at Ricmar Landscaping does amazing work and always goes the extra mile. When I initially hired him at a flat rate, he came back three days in a row to get the yard and garden my new house looking new again. After such an amazing job, I now have him come weekly. His work is timely, gorgeous and I’m always proud of my yard and garden after Ricardo has been here."
Before
Later
Additional Photos
Additional Photos
Additional Photos

+5

Recommended by100%of homeowners
Showing 1-10 of 18
Glass Block questions, answered by experts

Glass block installation can be relatively expensive due to the range of material costs and the labor time to assemble this type of specialty window. The process proceeds slowly as the glass does not absorb moisture from mortar and silicone caulk takes longer to harden, leaving spacers to hold up the structure until the caulk or mortar begins to cure. Plus, if your current windows have structural issues or damage, you’ll need to repair them before beginning the project, increasing your bottom line. 

Glass block mortar is the best choice for glass block window units. It is specifically formulated for glass block window installation. Glass block mortar is usually a mixture of Portland cement, sand, and special chemicals. It is a white mortar that is applicable inside and outside your home. Do not use regular tile mortar because it may not have the binding strength and flexibility required for glass block windows.

Most installations take 1-3 days, depending on the number of blocks and customization requirements.

Yes, professionals can install decorative or colored glass block patterns for a unique look.

Glass walls are more expensive overall than their brick or drywall counterparts. However, if you need walls for a building with more than two or three stories, glass walls are the more budget-friendly option.

The Rainier, WA homeowners’ guide to glass block services

From average costs to expert advice, get all the answers you need to get your job done.