Top-rated basement remodelers.

Get matched with top basement remodelers in Weston, VT

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Weston, VT?

Select your specific project to find the pro for you.

Find Basement remodelers in Weston

Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Weston, VT and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for NET ZERO DESIGN, INC.
NET ZERO DESIGN, INC.
5.0(
7
)

Serving Weston, VT and surrounding areas

In business since 2016

Free estimates

Warranties offered

"Net Zero Design deserves the highest praise for their outstanding work on transforming my basement in Vermont from a lackluster storage space into a breathtaking game/media room, complete with an extra bedroom and bathroom. The project exceeded all expectations, turning what was once a seemingly unusable area into the jewel of my home. The attention to detail and commitment to excellence displayed by Net Zero Design throughout the renovation process were truly remarkable. The game/media room is a masterpiece. The team's creative vision and skillful execution have resulted in a space that combines functionality with aesthetics. From custom-built entertainment units to carefully chosen lighting fixtures, every element contributes to the overall ambiance of the room. The addition of an extra bedroom and bathroom has not only increased the livable space in my home but has also added tremendous value. The seamless integration of these new elements into the existing layout showcases the expertise and meticulous planning of the Net Zero Design team. Communication was transparent and efficient throughout the project. They kept me informed of the progress, promptly addressed any concerns, and ensured that the final result aligned with my vision. The transformation was completed within the agreed-upon timeframe, showcasing their commitment to punctuality and professionalism. I am beyond thrilled with the outcome of the basement renovation. Net Zero Design has turned what was once a forgotten space into a focal point of my home. If you're looking for a general contractor with a keen eye for design, craftsmanship, and the ability to turn dreams into reality, Net Zero Design is the clear choice. I wholeheartedly recommend them for any home renovation project."
Basement Renovation
Basement Renovation
Basement Renovation
Kitchen Remodel
Air B&B Exterior

+11

Response time1 day
Recommended by100%of homeowners
Avatar for Affordable Roofing
Affordable Roofing
3.6(
20
)

Serving Weston, VT and surrounding areas

In business since 1985

Free estimates

Emergency services offered

"Jack and his crew did an excellent job. My location is somewhat difficult in several respects. One side of the house faces Lake Champlain and the only access to that side is from the deck. There is no ground on which to stage ladders but they made it work. Parking is also an issue and they were able to bring their trailer and place it in a location that allowed the neighbors access to their property. Sounds confusing but this is "rural Vermont"
The job was a day and half. They cleaned up carefully making sure all nails and old shingles were picked up and removed. Everyone was polite and professional.
"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+8

Recommended by85%of homeowners
Showing 1-10 of 35
Basement Remodel questions, answered by experts

For most basement remodels, you’ll want to hire a general contractor. This is for a number of reasons, but the main two are that general contractors have dedicated teams they are comfortable with, and hiring one means you only have to deal with one pro. You may also get a better project quote since they can lump all their work and subcontracting into a single quote. 

Walkout basements are not generally included in a home’s square footage, although they may be if they meet certain conditions that depend on local regulations. A finished walkout basement used as a living space may be counted toward square footage in some locations as long as all codes for livable space are met.

While bathrooms and kitchens are nearly equal in terms of renovation difficulty, kitchens are the most challenging. Kitchen design, layout, electrical, and plumbing needs all depend on each other for the success of the entire project, and mistakes early in the project can cause trouble later on.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

The Weston, VT homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.