Top-rated basement remodelers.

Get matched with top basement remodelers in Wardsboro, VT

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Wardsboro, VT?

Select your specific project to find the pro for you.

Find Basement remodelers in Wardsboro

Avatar for The Handyman Company
The Handyman Company
4.9(
11
)
Basement - Remodel

Serving Wardsboro, VT and surrounding areas

Approved

In business since 1999

Free estimates

Credit card accepted

Need Help? if its broken, cracked, or rotted we can fix it. Offering homeowner, landlord and business maintenance, and repair services. From foundation to roof we can help.\nRoof repair, window and door installations, tile, hardwood, laminate flooring, kitchen & bath remodeling, foundation crack repair, basement waterproofing, drywall repair, assembly service, TV mounting service and so much more

Tear out and clean up debris
Taking out old cabinets
Tile installation
sheetrock/tile
Custom Cabinets

+68

Response time1 day
Recommended by100%of homeowners
Green Mountain Design Build
5.0(
5
)
Basement - Remodel

Serving Wardsboro, VT and surrounding areas

Approved

In business since 2020

Free estimates

Warranties offered

"Great! It was a pleasure to work with Brad at Green Mountain Design Build. He did a fantastic job renovating two bathrooms as well as several bedrooms and a basement room at our house. Brad is highly professional and reliable and he has excellent design advice"
Remodeling - General Project
Remodeling - General Project
Remodeling - General Project
Remodeling - General Project
Additional Photos

+18

Response time5 days
4 neighbors recently requested a quote
Recommended by100%of homeowners
Calvary Custom Builders, LLC
4.3(
7
)
Basement - Remodel

Serving Wardsboro, VT and surrounding areas

Approved

In business since 2005

Free estimates

Emergency services offered

Calvary Custom Builders, LLC is proud to be a locally owned and operated company that serves Windham and Bennington Counties and the surrounding communities. From custom home building to remodels we will bring our years of experience to your project. We have built our business on providing 1st class craftsmanship at a fair price. Each project is unique so we will work with you on finding out what you are wanting to accomplish and making that dream become a reality. \n\nOur reputation has been built on being timely, tidy and making sure that every customer is 100% satisfied when we are done with the job. Let us show you why we are #1 in the area. Get in touch to discuss your project today!

Master Bathroom
Master Bathroom
Master Bathroom
Master Bedroom
Whole Home Remodel

+103

Response time5 days
Recommended by100%of homeowners
Avatar for Vista Home Improvement
Vista Home Improvement
4.3(
419
)
Basement - Remodel

Serving Wardsboro, VT and surrounding areas

In business since 2005

Free estimates

Emergency services offered

"It worked out very well. It was extremely well done. The door was short and narrow so they had to come in and rework the door frame so that I could get a standard door put it. They had to cut the door down to the right height and they angled it nicely so that I’m not getting drafts out of the basement. The carpenter who came was superb. I did comparative shopping and their price was a little bit high but the quality was excellent so I didn’t feel earned or anything. I already have used them again and I have a couple of projects planned for next season and they’re on my list to call. They definitely made an impact."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+41

Recommended by87%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Wardsboro, VT and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Patrick McQuillan
5.0(
2
)
Basement - Remodel

Serving Wardsboro, VT and surrounding areas

In business since 1985

Free estimates

With over 30 years of experience in the addition and remodels industry, we are the experts you need to take care of your home or business. We handle everything from kitchen remodels to historic barn repairs. We will treat your home as we would treat our own. Give Patrick McQuillan a call today, we look forward to working with you! \n

Response time3 days
Recommended by100%of homeowners
Vertex Contracting Inc.
5.0(
5
)
Basement - Remodel

Serving Wardsboro, VT and surrounding areas

In business since 2022

Free estimates

Warranties offered

3rd generation electrician. We specialize in re-wiring historical sites, electrical services, repairs, installs, troubleshooting, lighting, panel upgrades, ceiling fans, EV/Electric Charging Stations, and more! We guarantee your satisfaction, and we won’t leave until the job is done right. We pride ourselves on the quality work we provide, while delivering great customer service! Check out all the services we offer below and call -or- click to schedule a free estimate today!

Recommended by100%of homeowners
Showing 1-10 of 39
Basement Remodel questions, answered by experts

Egress windows or doors are required in finished basements to meet safety and building codes. If your basement is unfinished and used as a storage space, egress windows are not required, but anything considered a habitable space must have an additional point of egress in addition to the stairs.

If you’re not sure which method of raising the ceiling is best for you, here are a couple of considerations to help you make that decision. A professional ceiling company will be able to help you determine the best option for your home.

  • How long you are planning to live there: although raising the basement ceiling will increase the value of your home, if you’re planning to sell the house, then go for raising the house.

  • The condition of the foundation: to lower the floors, your foundation has to be intact whereas raising the house will allow you to restore the damaged foundation.

The most challenging part of finishing a basement is addressing moisture control. Basement waterproofing is an essential task that requires a professional’s skills and knowledge. If you don’t properly waterproof your finished basement, it’ll be vulnerable to dampness, water damage, and mold growth. Ensuring proper insulation and ventilation to combat these issues while meeting building codes adds complexity to your remodeling project.

Basements are commonly converted into game rooms. The potential challenges you may run into include controlling moisture, working with low ceilings, limited natural light, and the need for additional electrical or HVAC work. Addressing these issues can add to the total cost, but it ensures a comfortable and functional space.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Wardsboro, VT homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.