Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Onancock, VA

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Onancock, VA?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Onancock

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Onancock, VA and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Install Above Ground Pools questions, answered by experts

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

You shouldn’t swim in a pool with algae. When there’s algae, there’s also bacteria that’s feeding on the algae. Also, algae-infested pool water is often chemically imbalanced, which means germs like Cryptosporidium, Giardia, and E.coli could be present. These germs can cause a range of illnesses from gastrointestinal issues, to rashes, and respiratory problems.

The best thing to do is to get rid of the algae first, test and balance the water, and then you can enjoy swimming without any worries.

There are some disadvantages to a salt water pool. Besides costing slightly more than chlorine pools, salt water pools require a lot of salt. It's also harder to find a professional with salt water pool experience to do minor maintenance and repairs. Salt water can also damage some materials, so you’ll need to use specific heating, fixtures, lighting, liners, and masonry when building a salt water pool.

Common problems include liner tears, pump malfunctions, and algae buildup. Regular maintenance prevents many issues.

The only pools that don’t need grounding are those without electrical components, such as small inflatable pools. Any outlet around a pool should be a GFCI to cut the current if the outlet gets too wet. At the very least, the pool’s electrical should be plugged into a GFCI outlet, if not a dedicated GFCI breaker. Check local guidelines and requirements to ensure you’re following all safety regulations. 