Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Needville, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Needville, TX?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Needville

Avatar for JB Paving & Construction
JB Paving & Construction
5.0(
5
)
Asphalt Paving - InstallAsphalt Paving - Repair or PatchAsphalt Paving - Install- For Business+1 more

Serving Needville, TX and surrounding areas

Approved

Free estimates

Warranties offered

Credit card accepted

"Our driveway and parking situation at our office was getting to be in bad condition, so I was looking around to find someone trustworthy and that was tedious on there work, after lots of time looking around I found JB paving & construction and I can say that I am very satisfied with the work they had put in. I would recommend this company to anyone looking for the services they provide. They put pride in there work and they make sure to get the job done correctly while being time sufficient."
Mont Belvieu, Tx Project
Base Installation
Mont Belvieu, Tx Project
Asphalt Installation
Mont Belvieu, Tx Project

+28

Response time3 days
5 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for New Ground Services
New Ground Services
4.8(
24
)
Interlocking Pavers for Driveways & Floors - Install

Serving Needville, TX and surrounding areas

Approved

Super Service Award Winner

Free estimates

Credit card accepted

Customers say: True professional

"The guys over at New Ground are as professional as professionalism comes. Their knowledge base far exceeds what you typically find when requesting a quote. The team always provides a detailed manifest of all products and materials used for the scope of work related to the project. That said, the level of expertise has yield some amazing landscaping designs (5) at my home. I would recommend New Ground 10/10!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
15 neighbors recently requested a quote
Recommended by76%of homeowners
Avatar for Texas Fence
Texas Fence
4.6(
459
)
Gate for Driveway or Security - Install or Replace

Serving Needville, TX and surrounding areas

Approved

Super Service Award Winner

In business since 2003

Free estimates

Warranties offered

"Texas Fence did a good job installing new fence. Rosemberg was great to work with. Daniel ensured that fence was installed timely. Jessica in front office responded timely to requests. Five star job."
.
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+9

Response time2 days
Response rate100%
5 neighbors recently requested a quote
Avatar for REL Services
REL Services
5.0(
13
)
Brick and Stone Driveways & Floors - InstallConcrete Driveways - Install

Serving Needville, TX and surrounding areas

Approved

Super Service Award Winner

In business since 2022

Free estimates

Offers commercial services

REL Services is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers interests and make their concerns the basis of our business.\n

A
B
C
D
Response time4 days
1 neighbors recently requested a quote
...
Showing 1-10 of 371
Asphalt Driveways questions, answered by experts

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The driveway apron is a technical term referring to where a private driveway meets the public street. If there is a sidewalk in front of the house, the driveway apron is typically on the opposite side of the public sidewalk from the driveway itself.

Building a road on a slope requires careful planning and will normally require a drainage system underneath to prevent flooding and damage to the road over time. Your professional may lengthen your road to create switchbacks if the slope directly to your home is too steep, as there are regulations for maximum road slope. The drainage system will help prevent runoff from the higher side of the slope from damaging the asphalt or concrete. Keep in mind that building a road on a slope isn’t a good DIY project, as a lot can go wrong.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

The decision to repair or replace your driveway depends on the extent of the damage. If your driveway has a few small cracks, a simple repair will do the trick. If you see larger cracks and potholes, it may be time to consider resurfacing or replacement. Resurfacing is a great option if more than 25% of the surface is damaged, but if the damage is extensive—deep cracks or significant sinking—it’s best to replace the driveway entirely. A new driveway, with proper care, can last decades while patching or resurfacing might only hold up for a few years before needing more attention.

The Needville, TX homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.