Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Winfield, TN

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Winfield, TN?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Winfield

Landesman Lawncare
4.7(
15
)

Serving Winfield, TN and surrounding areas

Approved

In business since 2018

Free estimates

Emergency services offered

"First off I’d like to say I’m a very picky person and typically do everything myself, but a friend recommended landesman lawn care and assured me they were what I was looking for. And boy did they exceed my expectations! Very clean, precise and professional work with a great attitude aswell! Safe to say I’ve found my permanent landscapers, thanks Jesse!"
Stone stair case
Stone retaining wall repair
Water front natural stone steps
Landscaping Project
Stone stair case

+56

3 neighbors recently requested a quote
Recommended by92%of homeowners
Avatar for Stefaniak Construction
Stefaniak Construction
4.7(
13
)

Serving Winfield, TN and surrounding areas

In business since 2017

Free estimates

Credit card accepted

"I’ve had Stefaniak Construction replace my decking and railings, install exterior french doors as well as windows, and several smaller tasks and am extremely pleased with how they all turned out. Will be hiring them for more projects in the future."
Custom fireplace
Installed new door where window was built stairs and finishing up stain
We started to tear the chimney down
Custom fireplace
Outside after we stained everything

+55

Recommended by100%of homeowners
Avatar for T-Rex Paving & Sealing
T-Rex Paving & Sealing
3.8(
16
)

Serving Winfield, TN and surrounding areas

In business since 2014

Free estimates

Credit card accepted

"The representative was thoughtful and very knowledgeable. He also explained that it may be a few weeks. Seven days later he phoned and said his crew would be over in the afternoon. An array of specialized machinery. A job well done. Bob S."
Nissan Parking Lot
Striping
Sealing & Striping
Sealing & Striping
Sealing & Striping

+4

Response time4 days
Recommended by81%of homeowners
Showing 1-10 of 41
Asphalt Driveways questions, answered by experts

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

There’s no single best asphalt grade—it all comes down to where and how it’s used. Highways and heavy-traffic roads need something tough, like polymer-modified asphalt (PMA) or Stone Matrix Asphalt (SMA). Local roads and parking lots rely on the Performance Graded (PG) system, chosen based on climate. A PG 64-28 mix, for example, handles a broad temperature range while simpler, more cost-effective mixes are typically enough for residential driveways. The best grade of asphalt depends on traffic, weather, and your budget, which is why a professional’s input is always a smart move before making a decision.

Concrete is typically the best material for a driveway if you’re looking for longevity, cost-effectiveness, and ease of maintenance. But, it’s not ideal for areas with annual freeze-frost cycles, nor is it the most attractive option—although you can get it stamped or painted. If your location is consistently below freezing, asphalt may be a better choice.

In the United States, roads are usually categorized as one of three types: public roads, other drivable roads, and non-drivable roads. These categories dictate how a road can be used; a non-drivable road might be classified that way because it is heavily damaged and unsafe for cars.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

The Winfield, TN homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.