Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Allardt, TN

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Allardt, TN?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Allardt

Wilson Paving
4.2(
60
)
Asphalt Paving - InstallAsphalt SealingAsphalt Paving - Install- For Business+1 more

Serving Allardt, TN and surrounding areas

Approved

In business since 1985

Free estimates

Credit card accepted

"Resurfaced driveway and extended it a bit. They responded immediately to my initial call and were out to give estimate the very next day; started work next working day. At my request, they reduced the estimate with modifications They responded to my dissatisfaction in appearance and returned to "make me happy"."
Response time2 days
8 neighbors recently requested a quote
Recommended by94%of homeowners
DMC Outdoor Living
4.3(
168
)
Interlocking Pavers for Driveways & Floors - Install

Serving Allardt, TN and surrounding areas

Approved

In business since 2017

Free estimates

Offers commercial services

"David was very detailed in his assessment of what needed to be done to solve our issues with proper drainage. We had 3 other estimates with only one of those competitive with David’s price. We decided to go with David because his solution was the least intrusive to the property as a whole while solving the drainage issues. Overall, the professionalism of David and his team along with the excellent results of their work would give me good reason to recommend DMC Outdoor Living to anyone wanting a solid job completed by a competent work group."
2 neighbors recently requested a quote
Recommended by82%of homeowners
Avatar for Old School Construction
Old School Construction
5.0(
3
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Paving - Repair or Patch+4 more

Serving Allardt, TN and surrounding areas

In business since 2015

Free estimates

Emergency services offered

"We get back to the basics" Repair, remodeling kitchen and bath, room additions, general remodeling, building, add ons, plumbing, concrete work,ceramic tile, hardwood flooring, Windows plus much more. Anything you need done, we can do. We come loaded with 35 years of combined experience. We pride ourselves on the work we do and making sure that our clients receive the lowest prices possible in these hard economic times.

Additional Photos
Additional Photos
Recommended by100%of homeowners
Showing 1-10 of 40
Asphalt Driveways questions, answered by experts

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

Asphalt and tarmac are not the same thing. Traditional tarmac, short for tarmacadam, uses tar as a binder to hold crushed stone together. Asphalt uses bitumen—a byproduct of crude oil—to bind aggregate. Though tarmac was once a go-to for roads, asphalt has become the modern standard. And these days, most surfaces referred to as “tarmac” are actually asphalt. So, while the names may overlap, the key distinction lies in the binder—tar for tarmac and bitumen for asphalt.

The dimensions of a driveway apron vary based on local building codes, the width of your driveway, and the distance between the driveway and the road. On average, aprons range from 12 to 24 feet wide and 8 to 18 feet long. Typically, the end of the apron connected to the driveway matches its width—such as 10 to 12 feet for a single-car driveway—while the end at the street flares out to allow cars to turn in and out more easily. In some areas, you may not be responsible for the portion of the apron that extends beyond the sidewalk, but this depends on local laws.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

When asphalt cures, it typically changes from a very dark black hue to a lighter, more matte gray color. Cured asphalt also won’t be tacky or sticky to the touch or emit any odors from the asphalt mix. Additionally, the surface of fully cured asphalt won’t deform under any pressure.

The Allardt, TN homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.