"Josh and crew provided exceptional service. He is very dependable. He’s prompt, courteous, and a true professional. He pays attention to detail and the quality of work is top notch. He takes pride in his work and makes sure it is done right. He goes above and beyond to make the customer happy. He arrives on time, completes the job better than you imagined, and leaves the property looking better than when he arrived. I would highly recommend."
"Excellent service. Cullen and his team were punctual and work was completed in a timely manner. Cullen responded quickly to emails. Worked with me to meet my needs and provide professional advice. Team cleaned up after they were done. Everything looks great. Looking forward to more work in the spring."
"Jim came out and gave me an estimate and we agreed on the price. He set the date and showed up with a crew to prep the driveway and then the next week came out with a larger crew to pave it. Honestly I was a little skeptical at first but when the pavement started pouring the crew jumped into action like a well oiled machine. Overall the driveway came out great. It was exactly what we wanted and at a prompt time. These guys are workers!"
"I screwed up the pavers in our rather large outdoor patio when I tried using Sakrete as grout. Turns out it was a bad idea as the pavers absorbed the Sakrete and the “grout” dried very unevenly. TJ and his crew ground down the excess / dried grout and then used a special / very fine grout that spread and dried evenly. The pavers and the patio now looks like new! These guys did great work and I can’t thank them enough (they even fixed a cracked sprinkler pipe while they were there - they saved the day!). I highly recommend TJ for any of your remodeling needs - trust me, you won’t be disappointed!"
"Please don't confuse these guys with B&M paving. I made a mistake and called to complain about B&M and ended up having a great convo with the owner of P&M and gave them a job happily. P&M = GREAT. B&M = Just awful"
"Once the work started, it went very well and efficiently. We had a few false starts, but it all worked out. Could not enter approximate cost of service in appropriate box, so I will add it here: $19,500.00."
"Shane and Nick did a great job, very professional, my job was rather complex I had a concrete pad removed, French drain installed removed and replaced four main deck support post, poured 3 new large concrete pads and installed a 20’ retaining wall. I would highly recommend"
While blacktop is a type of asphalt, the terms should not be used interchangeably, as not all asphalt qualifies as blacktop. The primary differences are in their composition, production process, and ideal applications. Blacktop contains more stone than other types of asphalt and is heated to a higher temperature during production—300°F or more—while hot-mix asphalt is heated to between 275°F and 300°F. The ratio of bitumen (a tar-like crude oil) is a key differentiator, though sources vary: some state blacktop has less bitumen, making it less durable, while others claim it has a higher ratio. Due to these differences, asphalt is generally more durable and better for high-traffic areas like highways and streets, while blacktop is more suitable for playgrounds and residential driveways. For a driveway project, it is best to consult a professional to determine the most appropriate material.
Think of the street as a way to capture all the elements on either side of the road, including the road—a street encompasses the homes or other buildings, the trees, and the road of a given area as defined by the beginning and end of the street on a map. A roadway, however, is the component of the street where cars travel.
It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting.
You’ll first need to install a base underneath your pavers for extra stability and drainage. Otherwise, the pavers can sink into the ground, and you’ll have to reinstall them. Use a base gravel layer of 4 to 6 inches for walkways and 10 to 12 inches for driveways. Compact your gravel layer every 2 to 4 inches so it’s nice and solid. After you install your gravel base, apply a 1-inch layer of sand on top.
Quality pavers and correct installation handle temperature variations. Proper maintenance is crucial in severe climates to prevent issues like heaving.
The Etna, PA homeowners’ guide to paving services
From average costs to expert advice, get all the answers you need to get your job done.
The cost of a tar and chip driveway falls between gravel and asphalt. Is this unique process the happy medium you've been looking for? Let's take a look.
Get proactive with marketing for your paving contractor business. Use these paving marketing ideas (ranked by budget and experience level) to grow your business, get more leads, and earn more money.