"The crew were sealing a neighbor's driveway and as they were finishing up, I asked about my driveway. I received a quote and within 30 to 45 minutes, the work was done. They even fixed a broken piece of asphalt. My driveway looks great!"
"Nick and his crew installed a new exposed aggregate concrete driveway in our home. He and his crew were professional and prompt throughout the entire process. We had gotten numerous bids for the job and his bid was competitively priced especially for the experience he has. The quality of work is exceptional and we get numerous compliments from neighbors daily on our new driveway. I would recommend Nick Scotti Concrete Contractor for any concrete work."
"Cullen and his team were total pros and did a fantastic job from planning to pricing to construction. I’d hire him again and would recommend him for any retaining wall/patio/driveway/landscaping work."
"We needed as asphalt apron added to our driving after having the concrete driveway installed and not being level with the road. Our vehicles would scrape upon entering the driveway every time. We called around and had a hard time finding anyone to take this job. P&M took the job and not only fixed the transition from the road to the driveway, but also paved to the drainage inlet to stop the pooling of water at the bottom of the driveway."
"Lou and his crew were great. Knowledgeable, easy to work with and quality. Lou came out measured everything up and gave me a quote over the phone later that day. Got me in the schedule and we coordinated around his other projects. Removed old asphalt driveway and installed new concrete slab in 3 days. Would hire Goodfellas again and recommend."
"Driveway looks amazing! Brendan provided a great experience all around. Was able to stop by the same day for an estimate and was back the next day to complete the work. He listened to my concerns about a mess a previous contractor made and provided all the answers/suggestions I needed to hear. Showed up exactly when he said he would and did a great job with prep. Will definitely be saving his info for next time the driveway needs sealed or patched up. TL;DR: High quality product, high quality work, high quality guy 👍🏻"
"Brandon and his team showed up day to start the work a few days before I asked them to begin which was a plus because our concrete church ramp needed repaired soon for safety reasons. The work was completed with professionalism and did not interfere with our church services. Brandon was also easy to contact and returned calls and text messages in a timely manner"
When comparing installation costs, asphalt is often less expensive upfront than concrete. Asphalt prices typically range from $7 to $15 per square foot, while concrete can range from $3 to $18 per square foot. However, long-term costs should also be considered. Concrete driveways generally last longer (up to twice as long) and require less maintenance, which can make them more affordable over their lifespan. While asphalt has a lower installation cost and is easier to repair, it requires more frequent maintenance, such as sealing, which can add up over time. Therefore, while concrete is more expensive initially, its durability may offset the cost in the long run.
New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.
During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.
The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.
New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.
By grading and compacting the base soil, ensuring proper drainage and stability.
Wet cutting is usually the preferred method. It controls dust, which helps protect your lungs and makes for a cleaner working environment. Plus, the water cools the blade, preventing overheating and prolonging its life while providing smoother, more precise cuts. The downside is the mess—water and asphalt sludge can be messy to clean. Dry cutting, though convenient if water isn’t available, creates a lot of dust, which can be harmful. This also increases the risk of blade damage due to overheating. So, if you have the option, wet cutting is the better method for most asphalt jobs.
The Aspinwall, PA homeowners’ guide to asphalt driveway services
From average costs to expert advice, get all the answers you need to get your job done.
Adding a new asphalt driveway to your home can boost its overall appearance and give homeowners a nice ROI down the line. But how long do asphalt driveways last, and what can you do to maximize their lifespans? Read this guide to find out.