Top-rated paving pros.

Get matched with top paving pros in Red Oak, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your paving service project in Red Oak, OK?

Select your specific project to find the pro for you.

Find Paving pros in Red Oak

Avatar for Owens Excavation & Dirtwork Corp
Owens Excavation & Dirtwork Corp
5.0(
3
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Red Oak, OK and surrounding areas

Approved

In business since 2021

Offers commercial services

Customers say: Quick response

"Great company to work with.... I had several projects for the past couple years including: 2 ponds dug - no leaks & holding solid, built roads, had coverts installed, clearing of land and trenching work for electrical. I would highly recommend, they've done a wonderful job every single time. Extremely professional to make sure it's done right and that you're happy with services provided. I would work with them again on any project needing large requirement in the future."
Response time1 day
4 neighbors recently requested a quote
Recommended by100%of homeowners
Showing 1-10 of 34
Paving Services questions, answered by experts

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

Whether you decide to DIY paver installation or want to hire a pro, it’s smart to understand the process. First, you’ll need to prepare the area by clearing away grass and dirt. Next, you’ll add the paver base of gravel and sand before laying the pavers on top. You may need to cut pavers to fit your space or the landscaping design and add edging stones.

Professional installers often include a deep layer of crushed gravel under permeable pavers to allow more runoff to soak through into the soil below. Many installations will include multiple layers of gravel, with coarser aggregate at the base and finer aggregate that sits on top of that bottom layer. Above the gravel, you’ll often find coarse sand that helps reduce paver shifting over time. Some permeable paver designs include a water collection system set into the gravel layer to route runoff to a safe area for disposal.

Depending on project size, typically 1 to 3 days, including preparation and installation.

You can pour concrete over asphalt if it’s in good condition, thick, stable, and well-compacted. Concrete is more durable than asphalt and can extend the lifetime of your driveway without having to pay frequent asphalt driveway repair costs or replace it completely. 

But this is best reserved as a temporary solution based on budget restraints, as asphalt requires more frequent repairs and assessments than concrete. Once that concrete top is poured, it’ll be harder to accurately understand what’s happening beneath that layer, which could lead to more issues.

The Red Oak, OK homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.