Top-rated paving pros.

Best paving pros near Eufaula, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your paving service project in Eufaula, OK?

Select your specific project to find the pro for you.

Top-Rated Paving pros in Eufaula - Updated Nov 2026

Avatar for Martin Construction and Landscaping llc
Martin Construction and Landscaping llc
4.9(
9
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Eufaula, OK and surrounding areas

In business since 2021

Free estimates

"Erika and Jeffrey were very prompt in giving us a very reasonable quote to have sod laid. We signed with them, the next day fresh cut sod got delivered and job got done. I would HIGHLY recommend Martin Construction and Landscaping. Their team of workers are very professional, efficient, and do top notch work. Lynette"
Sod
Landscaping Project
Landscaping Project
Before Picture
Before clearing the land

+164

Recommended by100%of homeowners
Showing 1-10 of 49
Paving Services FAQs, answered by experts

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

Whether you decide to DIY paver installation or want to hire a pro, it’s smart to understand the process. First, you’ll need to prepare the area by clearing away grass and dirt. Next, you’ll add the paver base of gravel and sand before laying the pavers on top. You may need to cut pavers to fit your space or the landscaping design and add edging stones.

A traditional driveway gate isn’t your only option when installing a barricade in front of your driveway. A security gate like a swing gate, double swing gate, bi-folding gate, vertical gate, or pivot gate could work just as well as your driveway gate—if not better for your home depending on which qualities you’re after. Like sliding driveway gates, many of these alternatives work with automatic features that simplify entering and exiting your property.

Depending on project size, typically 1 to 3 days, including preparation and installation.

In most cases, you don’t need a permit to repave your driveway, although some exceptions exist. If you’re widening your driveway and plan on widening the apron as well, you’ll usually need a permit from the Department of Transportation in your area. This permit costs between $50 and $300 in most cases. Most municipalities will also require a certified and insured contractor do the work relating to the apron and curb cut. You can contact your building department or ask your paving company if you need a permit. Your driveway professional will usually pull the permit for you.

The Eufaula, OK homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.