Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Perry, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Perry, OH?

Select your specific project to find the pro for you.

TRUSTED BY PERRY, OH HOMEOWNERS

  • Average homeowner rating star icon4
    Average homeowner rating
  • Verified reviews icon75
    Verified above ground pool installation services reviews

Find Above ground pool installation pros in Perry

Avatar for Prestige Pool Care
Prestige Pool Care
4.8(
61
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Perry, OH and surrounding areas

Approved

In business since 2013

Free estimates

Credit card accepted

"Nick called right away and was very professional. He went above and beyond my expectations. My pool was green and full of algae. He turned it around in a few days and was finished in time for my son's graduation party. He was very responsive and I would recommend him to anyone."
AFTER
BEFORE
Drain+Chlorine Rinse
Filter Clean
After

+5

82 neighbors recently requested a quote
Recommended by58%of homeowners
Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Perry, OH and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Install Above Ground Pools questions, answered by experts

Many providers include essential accessories like ladders and skimmers. Confirm details before starting the project.

In combination with adequate filtering and water chemical balance, vacuuming will keep your pool from being overrun with algae. If your pool is experiencing algae growth, the same combination will get rid of it with a bit of patience. Heavy algae growth may require the use of an algaecide, and in some cases, you’ll want to vacuum the pool 24 to 48 hours after using algaecide to remove dead algae debris.

Most of the time, though there may be some code variations on the local level, a water source like a pool requires a GFCI breaker. These breakers detect electrical leaks of 5 mA or more and trip the breaker. However, the size of the pool and motor type determine the exact GFCI needs. A GFCI outlet with a reset button may be enough for an aboveground pool with a small motor or pump. Consult a pool electrician to determine the appropriate installation and protection measures needed for your pool.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

Aboveground pools take between one day to a few days to install, depending on the pool size and type. Your project may take longer if you’re planning to complete other projects simultaneously, like building a deck around the pool. If your land is hilly or rocky, you’ll also need to budget time for the land preparation. Aboveground pools need to be installed on a level surface.

The Perry, OH homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.