Top-rated basement remodelers.

Get matched with top basement remodelers in Bucyrus, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Bucyrus, OH?

Select your specific project to find the pro for you.

Find Basement remodelers in Bucyrus

Avatar for Finished Basements Plus Inc.
Finished Basements Plus Inc.
4.8(
113
)
Basement - Remodel

Serving Bucyrus, OH and surrounding areas

Approved

Super Service Award Winner

In business since 1990

Free estimates

Emergency services offered

"After Receiving quotes from 4 companies, we went with Finished Basements Plus. Not only did they offer the best price, but also included all permits and quality features such as metal framing without us having to ask. Todd, Brian, and their crews were great to deal with throughout the whole project. If getting the job done right for a great price are your priorities (and not speed), these guys are a great choice. We plan on hiring them again to remodel our master bathroom."
entertainment center and wet bar.
9ft wet bar
Additional Photos
Additional Photos
Additional Photos

+34

Response time2 days
Response rate100%
Recommended by95%of homeowners
Avatar for Mid-State Basement Systems
Mid-State Basement Systems
5.0(
15
)
Basement - Remodel

Serving Bucyrus, OH and surrounding areas

Approved

In business since 1986

Free estimates

Emergency services offered

"I am amazed at The quality of their customer service. Before I became disabled, I was employed at the hospital for 28 years and I know how hard-working with the public can be. I really need to give a hats off and a pat on the back to (midstate Basement) systems they came in and did work on my basement and had to come back and adjust some things… Not one time did they roll their eyes or give me a hard way to go about it. Levi ,Judd, Ernest, Jonathan & Adrian were very friendly, courteous & Ernest, Levi and Judd always answered any question I give them and was quick to be of help and to get me scheduled in I would highly recommend Midstate Basements systems to anybody that needs any kind of basement or crawlspace work done. I had my basement done and I’m gonna have to have my crawlspace done in the future and they will definitely be the company I contact. You can’t go wrong by hiring them. Fast, friendly service, each and every time."
Before
After
Foundation Before
Foundation After
Modernized Basement

+6

Response time2 hrs
Response rate100%
4 neighbors recently requested a quote
Avatar for Bowman Floor & Home
Bowman Floor & Home
5.0(
8
)
Basement - Remodel

Serving Bucyrus, OH and surrounding areas

In business since 2020

Free estimates

Emergency services offered

"Amazing! I've had my kitchen floor replaced a half dozen times. This is far away the best!. Very particular work. Thorough and clean. Did well dealing with the quirks of my 100 yr. Old house! In addition to a beautiful floor I now have a back door that is functioning for the 1st time in 55 yrs. I highly recommend this business!!"
Ceramic Tile (Rustic Barn Planks)
Herringbone Install Pattern
Remodeling - General Project
Vinyl Planks - Dayton
Vinyl Planks - Fort Wayne

+52

Recommended by100%of homeowners
Avatar for Buckeye Waterproofing Inc
Buckeye Waterproofing Inc
4.1(
54
)
Basement - Remodel

Serving Bucyrus, OH and surrounding areas

In business since 2003

Free estimates

Emergency services offered

"Upon discovering water leaking into my basement i contacted buckeye waterproofing. Jerry Schieve, field supervisor came out and gave an estimate and scheduled the work.. Within 2 weeks the crew was at my home working. IT took 3 days to complete and everything went well.
"
Recommended by76%of homeowners
...
Showing 1-10 of 63
Basement Remodel questions, answered by experts

A walkout basement is considered to be partially below grade because at least one wall is entirely exposed. In some cases and in specific municipalities, inspectors and appraisers will still count walkout basements as below grade, which means the space can’t serve as living space or be rented out. If you intend on using the area as living space or a separate apartment, you should check with your local building department to make sure it’s legal to do so.

The most challenging part of finishing a basement is addressing moisture control. Basement waterproofing is an essential task that requires a professional’s skills and knowledge. If you don’t properly waterproof your finished basement, it’ll be vulnerable to dampness, water damage, and mold growth. Ensuring proper insulation and ventilation to combat these issues while meeting building codes adds complexity to your remodeling project.

Yes, you can add a kitchenette to a basement. However, you’ll have to consider the costs associated with basement kitchenettes. If you’re starting from scratch in an unfinished basement, you’ll need to account for brand-new plumbing, electrical, flooring, and more in addition to the cost of the kitchenette. If you’re putting a kitchenette in an already finished basement equipped with plumbing and electrical, you’ll save considerable money.

Finishing a basement can provide a great return on investment, by increasing the market price of your home when you want to sell. Beyond that, there are many reasons to finish your basement. Doing so expands the usable square footage of your home, so you can enjoy it more, even as your family grows. Renovating your basement costs less in terms of time, energy, and money than having to search for and buy a new home.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Bucyrus, OH homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.