Top-rated basement remodelers.

Get matched with top basement remodelers in Carey, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Carey, OH?

Select your specific project to find the pro for you.

Find Basement remodelers in Carey

Avatar for A - Z Construction
A - Z Construction
5.0(
4
)
Basement - Remodel

Serving Carey, OH and surrounding areas

Approved

In business since 2016

Free estimates

Emergency services offered

"Anthony & crew were terrific They showed up on schedule & completed the job in the agreed upon timing. Anthony discussed all plans in advance, didn’t change plans or move ahead w/ a couple of things that came to light once the actual work started without talking to us first. He is very pleasant and easy to work with. I have a couple of other jobs that will head his way once we get them going. I will hire them again. No question."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+14

2 neighbors recently requested a quote
Recommended by50%of homeowners
Avatar for Gorney Builders
Gorney Builders
0.5(
1
)
Basement - Remodel

Serving Carey, OH and surrounding areas

Approved

In business since 2000

Free estimates

Warranties offered

We are a locally owned and operated company that values honesty and integrity, and treats your home as if it were our own. We offer a variety of services that are customization to each individual project. You will find us to be competitively priced, paying close attention to the details of each and every project that we are involved with. We look forward to building lasting relationships, and guarantee your satisfaction!\n

Roof Replacement
Roof Replacement
Roof Replacement
Roof Replacement
Roof Replacement

+48

Response time8 hrs
Response rate100%
2 neighbors recently requested a quote
Avatar for Bazell Maintenance & Remodeling
Bazell Maintenance & Remodeling
3.9(
22
)
Basement - Remodel

Serving Carey, OH and surrounding areas

In business since 1996

Free estimates

Emergency services offered

"Initiall call returned in one day  and service was completed as promised.  crew of carpenters was excellent and fun to have working... certainly saved us  from a lot of labor that we were not quite willing to do ourselves.

UPDATE-6/6/15:

We used this company in the past for a roofing job that has since gone wrong, without appropriate follow-up or resolution from Bazell Maintenance & Remodeling. The door portion of the job in this review was originally very good, but as of now, you can hardly get the door open without yanking the knob off. I have yet to receive any resolution on this issue, either."
Additional Photos
Additional Photos
Additional Photos
Recommended by76%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Carey, OH and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 37
Basement Remodel questions, answered by experts

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

A finished basement does not always count as square footage, as this varies by state regulations. In areas that allow below-grade spaces to be included in a home's official square footage, the basement must typically meet certain conditions. These conditions often include having a functional egress and being a livable space with flooring, finished walls, and temperature control. To be certain, contact your local assessor to confirm your area's specific policies regarding basement square footage.

You should always use high-quality lumber for your framing in order to ensure it will last the test of time and resist moisture. Use 2-foot by 4-foot lumber that is pressure-treated for your framing.

Basements with persistent moisture problems or flooding shouldn’t be finished until the moisture issues have been fixed. In addition, if your foundation is cracked, you have unmitigated radon levels, or you have asbestos or lead pipes, remediate the underlying problem before finishing your basement. Turning a basement into living space before fixing these issues can lead to serious health risks or structural damage. 

Permits may be required for major repairs, structural work, or electrical and plumbing restoration after a flood. Check with your local building department to determine permit requirements and associated fees for your flooded basement cleanup project. Obtaining the correct permits helps ensure work is done safely and up to code.

The Carey, OH homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.