Top-rated basement remodelers.

Get matched with top basement remodelers in Crestline, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Crestline, OH?

Select your specific project to find the pro for you.

TRUSTED BY CRESTLINE, OH HOMEOWNERS

  • Average homeowner rating star icon3.9
    Average homeowner rating
  • Verified reviews icon15
    Verified basement remodels reviews

Find Basement remodelers in Crestline

Avatar for Premium7 Construction
Premium7 Construction
5.0(
14
)

Serving Crestline, OH and surrounding areas

Approved

In business since 2021

Free estimates

Emergency services offered

"Excellent. Everytime I walk into my remodeled kitchen it warms my heart. Ken was organized and efficient. He fulfilled all commitments and more. Thanks Ken."
Garage and Shed Building Project
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project

+71

Response time1 day
Response rate100%
2 neighbors recently requested a quote
Avatar for Miller & Sons Construction & Home Builders
Miller & Sons Construction & Home Builders
New to Angi

Serving Crestline, OH and surrounding areas

Approved

Free estimates

Warranties offered

Small jobs welcome

🏡 Dedicated to transforming homes with expertise in earthworks, concrete, pole barn building, and underground drainage. We believe in honest pricing and integrity, taking pride in our community and the quality of our work.

1 neighbors recently requested a quote
Avatar for Buckeye Waterproofing Inc
Buckeye Waterproofing Inc
4.1(
54
)

Serving Crestline, OH and surrounding areas

In business since 2003

Free estimates

Emergency services offered

"I Hired Buckeye Waterproofing because they did my son and daughter in laws house and they were very pleased and the basement looked great. I was nervous I'm an older man if I could've done it myself I would've but i'm glad I didn't. My basement was leaking had mold, a wall moving, and cracks. it was in awful shape and completely unusable. Rick came out and gave me an estimate which I felt was fair due to the horrible condition of the basement. I hired them right away and they got the job started right away. Rick came out with a crew of 4 guys the day the job was set to start. He explained everything to me went over the details I was able to tell him specifics I wanted they set up plastic so my stuff wouldn't get dirty and plastic hanging in the doorways so it wouldn't get the other room's  dirty. They also set up tarp to walk on so my floors didn't get dirty. They also set ply-wood on the lawn so the machine didn't ruin my lawn. Over a period of 4 days they waterproofed my basement from the outside and installed 6 structural straps from the inside. The sprayed mold removal on the walls and scrubbed them. They also filled in all the cracks with  mortar. The waterproofing fixed the leaking, the straps prevented the wall from moving more. I haven't had a problem since and i'm finally able to use my basement. I couldn't be more grateful and happy I hired them.
"
Recommended by76%of homeowners
Avatar for RAHicks Improvements
RAHicks Improvements
5.0(
14
)

Serving Crestline, OH and surrounding areas

In business since 2006

Free estimates

Credit card accepted

"Robert was hired for an addition, modification of existing garage, roofing, windows, and new siding. We created the plans and he brought them into action. The workmanship was wonderful. His crew were excellent and great guys. They are very hard-working. He was always a phone call or text away. He was great with communication during the project. The before and after of the home are astonishing and we are very happy. We would recommend R. A. Hicks for any home needs!"
Response time3 days
Recommended by100%of homeowners
...
Showing 1-10 of 81
Basement Remodel questions, answered by experts

The average cost to remodel a basement is between $12,100 and $33,400. Depending on the project's complexity, the price can be as low as $3,500 or exceed $50,200. For a simple project like adding a home office, you might spend between $500 and $3,000. However, a more extensive project, such as adding a bathroom, can range from $6,600 to $16,500. The final cost is influenced by factors like the basement's size and condition, the type of remodel, material choices, your location, and accessibility. For an accurate price, it's best to consult with a basement remodeling team.

Renovation enhances functionality, increases home value, and can add new space for personal or family needs. It typically modernizes older unfinished basements for new uses.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Renovations that add functionality or more comfortable floor space generally add the most value when remodeling your home. Attic or basement finishing can add floor space without altering the home's structure, saving you renovation money while adding valuable space. Smaller improvements, such as installing smart-home components or replacing entry doors and windows, also experience high ROIs. 

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

The Crestline, OH homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.