Top-rated basement remodelers.

Best basement remodelers near Tillson, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Tillson, NY?

Select your specific project to find the pro for you.

TRUSTED BY TILLSON, NY HOMEOWNERS

  • Average homeowner rating star icon5
    Average homeowner rating
  • Verified reviews icon10
    Verified basement remodels reviews

Top-Rated Basement remodelers in Tillson - Updated Nov 2026

Avatar for OC Construction
OC Construction
5.0(
7
)
Basement - Remodel

Serving Tillson, NY and surrounding areas

Approved

In business since 2025

Free estimates

Emergency services offered

"I had a great experience with OC Construction! They did an amazing job on my floors, tub and vanity ?they came out beautiful. The team was very professional, worked efficiently, and completed the job much faster than I expected without sacrificing quality. They were courteous, kept the work area clean, and paid attention to every detail. I highly recommend OC Construction to anyone looking for quality workmanship and reliable service. Thank you for a job well done!"
Exterior stone wall
Exterior stone wall
Exterior stone wall
Bathroom tile
Bathroom tile

+64

7 neighbors recently requested a quote
Avatar for C&O PrimeBuild LLC
C&O PrimeBuild LLC
5.0(
8
)
Basement - Remodel

Serving Tillson, NY and surrounding areas

Approved

Free estimates

Emergency services offered

Credit card accepted

"C&O was pretty efficient . Andrew and his team was always on time and communication was always there. They worked in a few rooms in my house including my kitchen.Prices were affordable. And everything was explained in detail. Would definitely recommend to anyone looking to renovate their home."
Kitchen Renovation
Kitchen Renovation
Kitchen
Before
Porch

+5

8 neighbors recently requested a quote
Avatar for Affordable Property Management
Affordable Property Management
5.0(
3
)
Basement - Remodel

Serving Tillson, NY and surrounding areas

Approved

In business since 2010

Credit card accepted

Customers say: True professional

Our mission is to be a provider that brings back the personal touch with our customers. We will build a relationship that will last a lifetime after you see our quality work. As a locally owned and operated business we feel invested in our clients and constantly strive for customer satisfaction. We won't leave until the job is done right! Call or click to schedule an estimate today!

2 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for HNI Builders
HNI Builders
2.9(
9
)
Basement - Remodel

Serving Tillson, NY and surrounding areas

Approved

In business since 2003

Free estimates

Emergency services offered

"Hugh's three workers were fantastic. They completed the work on the deck replacement in a day-and-a-half. The work was done cleanly with no damage to the landscaping that is so close to the project. Clean up when the project was completed is superior to any other we had done in the past. The refurbished storm door looks brand new and is a welcoming addition to the project. Hugh contacted us the same day as our request and showed up for the initial estimate on time. I cannot emphasize more what a pleasant experience it was having Hugh and his workers take care of our project. HNI is being highly recommended by us, and we will be calling him for additional projects in the future. The quality of the work done far exceeds the cost. Thank You. Hugh"
Kitchen Renovation
Family Room Renovation
Dining Room Renovation
Kitchen Remodel
Kitchen Remodel

+20

Response time3 days
Recommended by100%of homeowners
Let's Talk Kitchens & Baths
5.0(
1
)
Basement - Remodel

Serving Tillson, NY and surrounding areas

Approved

In business since 2025

Free estimates

Credit card accepted

"Ray has done numerous projects for me over the past 25+ years, from simple door replacements to full house renovations. Ray is attentive to details and ensures you are happy with the work. I have always found his pricing to be appropriate and competitive and, most importantly, he is a gentleman with whom you will always feel comfortable and respected."
...
Showing 1-10 of 158
Basement Remodel FAQs, answered by experts

Roughing in and connecting utilities are the hardest parts of finishing a basement, and they’re the parts we typically don’t recommend doing as a DIY project. Unfortunately, your finishing timeline can be extended by weeks while you wait for contractors and inspectors to install electrical wiring, plumbing lines, and heating/cooling equipment and carry out inspections.

Permits may be required for major repairs, structural work, or electrical and plumbing restoration after a flood. Check with your local building department to determine permit requirements and associated fees for your flooded basement cleanup project. Obtaining the correct permits helps ensure work is done safely and up to code.

The average cost of remodeling a basement is $30 to $75 per square foot. If your space is unfinished and looks like it may need more help, use the higher number when calculating your estimated basement remodeling costs. A good rule of thumb is to add an additional 20% to the top of your estimate to cover any “what if” situations.

Physically, the most challenging part of finishing a basement is installing egress windows or doors when the space is below ground level. Mentally, the hardest part may be envisioning the project and planning around load-bearing and mechanical obstacles.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Tillson, NY homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.