Top-rated basement remodelers.

Get matched with top basement remodelers in Milton, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Milton, NY?

Select your specific project to find the pro for you.

TRUSTED BY MILTON, NY HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon48
    Verified basement remodels reviews

Find Basement remodelers in Milton

Avatar for Proworks Interiors
Proworks Interiors
5.0(
6
)
Basement - Remodel

Serving Milton, NY and surrounding areas

Approved

In business since 2012

Free estimates

Warranties offered

"I have no skills or vision when it comes to construction, so there was no way I was going to attempt any part or function to finish my basement myself. There is so much involved with finishing a basement that the actual thought of getting it done was exhausting! John and his team made the large task to finish a basement easy! John has the skillsets to do the work and orchestrate different contractors with various skillsets to get each phase of the construction done. Proworks Interiors is very professional and know what they are doing. It was a great relief that they were able to make something that seemed impossible, possible in a matter of a few months."
Bathroom Remodel
Fireplace Wall
Fireplace wall
Bathroom Remodel
Basement Bar

+25

Response rate100%
Recommended by100%of homeowners
Avatar for Elite Construction Solutions
Elite Construction Solutions
5.0(
5
)
Basement - Remodel

Serving Milton, NY and surrounding areas

Approved

In business since 2023

Free estimates

Emergency services offered

"It was amazing! They showed up right away. The work done was beautiful. Their tile recommendation was even better than what we thought we wanted! Our customers are already asking who did the work."
My jobs
My jobs
My jobs
My jobs
My jobs

+16

8 neighbors recently requested a quote
Recommended by75%of homeowners
Avatar for Affordable Property Management
Affordable Property Management
5.0(
3
)
Basement - Remodel

Serving Milton, NY and surrounding areas

Approved

In business since 2010

Credit card accepted

Customers say: True professional

Our mission is to be a provider that brings back the personal touch with our customers. We will build a relationship that will last a lifetime after you see our quality work. As a locally owned and operated business we feel invested in our clients and constantly strive for customer satisfaction. We won't leave until the job is done right! Call or click to schedule an estimate today!

1 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for FJMG Home improvement
FJMG Home improvement
5.0(
2
)
Basement - Remodel

Serving Milton, NY and surrounding areas

Approved

In business since 2022

Free estimates

Warranties offered

"Joel is a very decent hard working gentleman. He cleans up after every job , and work very well . I just rented my apartment and I trusted him to go there and do all furniture assemble. Very humble . I recommend him to anyone who needs his service ."
Bathroom renovation
Bathroom renovation
Bathroom renovation
Bathroom renovation
Bathroom renovation

+10

6 neighbors recently requested a quote
...
Showing 1-10 of 196
Basement Remodel questions, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Any bowing in a basement wall indicates a problem that needs to be addressed by a professional. If your basement wall bows more than 1 inch, it's time for an inspection. Generally, a wall can bow up to 30% of its thickness (around 2.5 inches for an 8-inch-thick wall) before it becomes an urgent situation. Bowing of 2 to 4 inches is more straightforward to fix than bowing of more than 4 inches, which will require significant repairs. If the bowing is more than 6 inches, the wall will likely need to be replaced. The sooner you address the problem, the easier and less expensive the repair will be.

The best type of basement ventilation system depends on your budget, the moisture in your basement’s air, and the types of windows you have down there. You should consider all of these factors when choosing a ventilation system. However, the most effective method for basement ventilation is an energy recovery ventilator (ERV) or a whole-house ventilation system, which preheats or precools incoming air from the outside while also managing water vapor.

When choosing materials for finishing basement walls, consider factors such as moisture resistance, durability, and fire resistance. Opt for materials specifically designed for basement environments, like moisture-resistant drywall or cement board. Insulation with vapor barriers can help regulate temperature and prevent condensation. Consider using mold-resistant paints or coatings. 

Research and consult with experts to select materials that are suitable for your specific basement conditions and intended use. Prioritize quality and compatibility to achieve long-lasting and aesthetically pleasing results.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

The Milton, NY homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.