Top-rated basement remodelers.

Best basement remodelers near Highland, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Highland, NY?

Select your specific project to find the pro for you.

TRUSTED BY HIGHLAND, NY HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon34
    Verified basement remodels reviews

Top-Rated Basement remodelers in Highland - Updated Nov 2026

Kevin Babcock General Contracting
4.9(
49
)
Basement - Remodel

Serving Highland, NY and surrounding areas

Approved

In business since 1984

Free estimates

Offers commercial services

"I hired Kevin to remodel our two car garage into an extra room, along with building a laundry room along with plumbing, hallway, replacing garage door with a new wall/siding, new windows etc. Kevin Babcock and his team have been an absolute pleasure to work with. They are responsive to the needs of the homeowner, readily available throughout the entire project and amazing to work with. Kevin ensures his clients are constantly kept in-the-know about the progress and openly accepts feedback and ideas. He not only was attentive and accountable but his team does impeccable work that left us with a life changing home remodeling to accommodate our growing family. I would recommend Kevin to anyone for his skill, expertise and integrity and will continue to hire him for future projects of our own."
Response time1 day
12 neighbors recently requested a quote
Recommended by97%of homeowners
Avatar for V & S Home Improvement, LLC
V & S Home Improvement, LLC
4.9(
61
)
Basement - Remodel

Serving Highland, NY and surrounding areas

Approved

Super Service Award Winner

In business since 2016

Free estimates

Emergency services offered

"V&S did a fantastic job on our kitchen and bathroom remodel! From the beginning, they supported thoughtful design and recommended high quality materials. They worked quickly and always kept our space clean. They went above and beyond to create a functional space, recommending solutions I would not have originally thought of. For a full kitchen and bath remodel the total timespan was about one month, which was faster than I ever expected, and with no short cuts on quality. I highly recommend V&S for any home renovation project."
Kitchen Remodel
Kitchen Remodel
Deck Rebuild
Deck Rebuild
Repaint Stucco and Trim

+25

Response time10 hrs
Response rate90%
10 neighbors recently requested a quote
...
Showing 1-10 of 207
Basement Remodel FAQs, answered by experts

Egress windows or doors are required in finished basements to meet safety and building codes. If your basement is unfinished and used as a storage space, egress windows are not required, but anything considered a habitable space must have an additional point of egress in addition to the stairs.

If you’re not sure which method of raising the ceiling is best for you, here are a couple of considerations to help you make that decision. A professional ceiling company will be able to help you determine the best option for your home.

  • How long you are planning to live there: although raising the basement ceiling will increase the value of your home, if you’re planning to sell the house, then go for raising the house.

  • The condition of the foundation: to lower the floors, your foundation has to be intact whereas raising the house will allow you to restore the damaged foundation.

Anything having to do with the structure of your home, such as raising the ceiling, is usually the most expensive part of finishing a basement. Another project component that could be a surprisingly high expense is adding an exterior entrance. 

The cost of a walkout basement can be anywhere from $5,000 to $35,000.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Whether it’s more affordable to gut a house than build a new one depends on the markets where you'd be buying and selling. However, it’s usually less expensive to renovate a home than to build new construction. 

Most homeowners pay between $100,000 and $200,000 for demolition and remodeling costs, whereas the average cost to build a new home is between $139,000 and $531,300.

The Highland, NY homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.