"The tech was very knowledgeable and went above and beyond to satisfy us. Our faucet was broken would not attach to the sink as the copper seal broke to the water lines."
"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Install Above Ground Pools FAQs, answered by experts
A pool chiller will take anywhere from 12 to 14 hours to lower your pool's temperature by 1 to 15 degrees. Most people tend to run their coolers overnight, but larger pools in warm climates take longer to cool. Choosing a chiller with the right capacity can help speed up the process.
Setting up a pool on unlevel ground is not recommended as it can damage the pool or yard and put the safety of those using it at risk. If a pool isn't level, the water's weight won't distribute evenly, putting excessive pressure on certain parts. This can cause the pool liner to tear or the walls to collapse, leading to water damage, expensive repairs, or potential injury to swimmers. It is more cost-effective to level the ground correctly before installation rather than waiting to address serious structural issues later.
Building a pool yourself will take at least eight to 12 weeks. After all, this is the building timeline after hiring a pool contractor who knows how to draw up plans, analyze your landscape, and apply for proper permits. If you choose to tackle any part of the process alone, assume building a pool will take two to three months at a minimum.
A fiberglass pool lasts up to 30 to 50 years with proper maintenance. For the longest possible lifespan, keep your pool water pH as close to seven as possible. Test your water levels regularly, run your pool filter daily, and avoid draining the pool. Once your pool is 20 to 30 years old, you can prolong the lifespan by refinishing the shell.
The best way to kill off an algae bloom in an aboveground pool is to shock it with a large dose of chlorine. Shock typically kills off algae in about one to three days, although it can take longer if the pool water is in poor condition. After the shock treatment, add algaecide to prevent algae from growing back, and test the water every few days with test strips to ensure the pool’s pH doesn’t get out of whack.
The Mullen, NE homeowners’ guide to above ground pool installation services
From average costs to expert advice, get all the answers you need to get your job done.
Above ground pools are more affordable than inground pools, so can you put an above ground pool in the ground to save money? Learn when it’s safe to do so.