Install Above Ground Pools questions, answered by experts

No, shock and chlorine are not the same thing, though they are related and both are used for pool maintenance. Regular chlorine, often in the form of tablets, is a sanitizer used for routine, day-to-day maintenance to keep a steady chlorine level. Pool shock, however, is a highly concentrated dose of chlorine used periodically for a more intense cleaning. It rapidly raises chlorine levels to fix issues like cloudy water or algae growth and also eliminates chloramines, which are byproducts of regular chlorination. Because their purposes and concentrations differ, they are not interchangeable, and proper pool care typically requires using both.

Yes, you can absolutely use a sand filter with a saltwater pool, but you’ll have to make sure you have the right grade of sand to catch smaller particles, just like in a standard pool. To choose the right pool filter, consider the degree of filtration you’ll need. Cartridge or diatomaceous earth filters can remove smaller particles, so they’re better suited for a less chlorinated saltwater pool.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

Infinity pools do require slightly more maintenance than other pools because you’ll need to constantly monitor the water level. If the water level is out of whack, it won’t correctly flow over the edge, which gives the pool its infinity look. 

That said, the rest of the maintenance is largely dependent on the type of material you choose. Concrete needs a little extra care to prevent algae growth, and you will eventually need to resurface it. Fiberglass and vinyl liners are algae-resistant but they’re not as durable.

Don’t worry if your pool is still cloudy right after shocking it. Some shocking products will leave your pool cloudy for a day or so after using them. However, if your pool is still cloudy several days after shocking it, it could be due to poor filtration, low chlorine, or one of the other problems outlined above. If you’ve tried our fixes but still can’t clear the cloudiness, call a pool repair professional.

The Brady, NE homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.