Top-rated paving pros.

Get matched with top paving pros in Brady, NE

Enter your zip and get matched with up to 5 pros

Need a pro for your paving service project in Brady, NE?

Select your specific project to find the pro for you.

Find Paving pros in Brady

Mark's Concrete Designs
New to Angi
Interlocking Pavers for Patios, Walks & Steps - Install

Serving Brady, NE and surrounding areas

In business since 2015

Free estimates

Credit card accepted

We're dedicated to providing our clients with the very best in concrete patchwork and repair for sidewalks, patios, steps, and a variety of other projects. With over 5 years of industry experience, we take and enormous amount of pride in the attention to detail put into each of the projects we're involved with. We're known for our quality work and the integrity of our business. We look forward to building long-term relationships with our clients, and guarantee your satisfaction.

Response time2 days
Paving Services questions, answered by experts

The answer to whether or not you need to get a permit before you start your driveway can vary widely based on local ordinances and the scope of your driveway ideas. In most urban and suburban areas, a permit is needed before building a new driveway to ensure that a homeowner is using safe materials and proper drainage practices while designing and constructing a new driveway. In some rural areas, a homeowner may not be required to apply for a permit. When building a new driveway on your own, always check with your local building department to see if you need to request a permit. When hiring a driveway contractor, verify that the right permits are being used before driveway construction begins.

Depending on project size, typically 1 to 3 days, including preparation and installation.

When asphalt cures, it typically changes from a very dark black hue to a lighter, more matte gray color. Cured asphalt also won’t be tacky or sticky to the touch or emit any odors from the asphalt mix. Additionally, the surface of fully cured asphalt won’t deform under any pressure.

The recommended minimum amount for a paver base is 4 inches. From there, it depends on the kind of traffic the pavers will see and the current soil conditions. Two inches of paver base won’t create the amount of stability and support that pavers need to remain securely in place over time.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

The Brady, NE homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.