Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Midway, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Midway, NC?

Select your specific project to find the pro for you.

TRUSTED BY MIDWAY, NC HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon13
    Verified above ground pool installation services reviews

Find Above ground pool installation pros in Midway

Heather World Pools
5.0(
2
)
Swimming Pool - Above Ground, Build or Install - Need Materials

Serving Midway, NC and surrounding areas

In business since 2023

Free estimates

Credit card accepted

We are a locally owned and operated company. We value honesty and integrity in all aspects of our business. We offer a variety of above ground pool service that are customized to each individual project. We pride ourselves on the quality of our work, as well as our commitment to outstanding results. We look forward to building lasting relationships with our clients and guarantee your satisfaction!

Response time2 hrs
Response rate100%
Recommended by100%of homeowners
Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,689
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Midway, NC and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Avatar for JT's Painting, Repair, & Restorations
JT's Painting, Repair, & Restorations
5.0(
3
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Midway, NC and surrounding areas

In business since 2022

Credit card accepted

We are a company that focuses on bringing quality work and craftsmanship back into the minds of people when they think of a handyman. Our motto is to bring you the quality that you've been missing. And we aim to do that with every job.

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+16

Recommended by100%of homeowners
Showing 1-10 of 11
Install Above Ground Pools questions, answered by experts

The generator in your saltwater pool conversion kit transforms sodium chloride—the same salt as table salt—into chlorine. A process called electrolysis sends electricity through the water to interact with the chlorine ion. This ultimately creates the chlorine that keeps your pool safe and clean. The cell in your saltwater chlorine generator is the part that converts the salt into chlorine.

Pool lights are designed to be safe by protecting swimmers from electrocution. These lights are made with waterproof fixtures and seals to prevent contact with the water.

Electrocution from pool lights is still possible, but rare. Faulty wiring or broken lighting equipment can make lights unsafe, so it’s important to replace lights as needed and have an electrician inspect and upgrade the wiring.

It’s a good idea to call in a pro to fill in your pool, because there are many potential hazards to doing it yourself. Unless you’re careful, you can damage your septic tank, plumbing pipes, and sprinkler lines. It’s also possible to damage your sewer connections, utility lines, driveway, landscaping, and sidewalk.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

The time it takes for a pool heater to heat a pool can range from eight to 48 hours, with an average of about 12 hours for the initial heating. For a more specific example, an average-sized 15,000-gallon pool may take six to 10 hours to heat up by 10 degrees. The exact duration depends on several factors, including the pool's size, the type and size of the heater, the starting water temperature, and the outside air temperature. It may take some trial and error to determine the precise time your specific pool takes to reach a desired temperature.

The Midway, NC homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.