Top-rated basement remodelers.

Get matched with top basement remodelers in Lattimore, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Lattimore, NC?

Select your specific project to find the pro for you.

Find Basement remodelers in Lattimore

Avatar for Seminole Custom Homes, INC
Seminole Custom Homes, INC
5.0(
13
)

Serving Lattimore, NC and surrounding areas

Approved

Super Service Award Winner

In business since 1973

Free estimates

Warranties offered

"Fantastic, Bill and his crew did an excellent job on my deck, sunroom and most recently boardwalk down to the lake. They stayed on the project everyday until it was finished and polished off every little detail. Everyone was always friendly, accommodating and very pleasant. I would hire them again without hesitation!!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+11

Response time1 day
Response rate100%
7 neighbors recently requested a quote
Avatar for Asa Stanford Inc
Asa Stanford Inc
4.7(
116
)

Serving Lattimore, NC and surrounding areas

In business since 1994

Free estimates

"Where to even begin? Blake and Mark are the real deal. They know their craft, are honest, reliable, and great to work with. They take the time to learn what your “vision” is and the work with you to create it. Communication is on point….no surprises. This is the second project I hired them for, which pretty much says it all. If you’re lucky enough to land them as your contractors, you won’t be disappointed."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+16

Recommended by100%of homeowners
Avatar for Moisture Loc Waterproofing & Foundation Repair
Moisture Loc Waterproofing & Foundation Repair
4.6(
50
)

Serving Lattimore, NC and surrounding areas

In business since 1988

Free estimates

Credit card accepted

"The sales rep was very personable and seemed to have knowledge of drainage problems and solutions. The workers arrived on schedule and worked very hard to accomplish the task at hand. They routed the drainage to an open ditch parallel to the property. They also rerouted drainage for an existing, inefficient french drain and sump that was pumping water across the driveway that was washing the soil out from under the concrete and creating an unsightly stain. To this point, we felt that all was going well. The problem that arose was that the French drain they installed was still higher than the foundation of the house. They filled in the trench with gravel to facilitate drainage, but covered the gravel with the soil they removed, which is mostly clay. Consequently, the water still runs off across the top of the French drain and overwhelms the foundation. Moisture in the crawl space has not been significantly reduced. I talked to the rep about redoing the crawl space which had mold forming on the floor joists. He gave me a quote that included sealing all the vents, cleaning the mold, adjusting pitch of the interior perimeter French drain, relocating the crawl sump and pump to a better collection point, putting down new vapor barrier and installing a crawl space dehumidifier, ($1,500.00) at a total cost of $4,290.00. If we wanted mold remediation treatment in addition to just cleaning the mold, the cost was an additional $1,950.00. The rep also agreed to send a team back out to remove the top layer of soil from the French drain and fill the trench with gravel, build up the soil at the foundation, making the new French drain at a level lower than the foundation to contain the water, at no additional charge. Subsequent to all that, we discovered some major structural damage that was going to be costly. Alignment of priorities and available finances dictated that the crawl space would have to be put on hold, at least temporarily. I sent an email to the Moisture Loc rep explaining our dilemma, but reiterated that I still expected him to live up to his promise to fix the French drain deficiencies, for which I already paid handsomely. In spite of email, text messages and voice mail to the rep, I have never received the courtesy of a response. I can only conclude that since we had to suspend the crawl space work, there is no intention to make the necessary changes/repairs to the original work as promised.
"
Exterior Waterproofing
Closed Crawl System
Foundation Repair
Recommended by94%of homeowners
Avatar for MI Electric
MI Electric
4.7(
177
)

Serving Lattimore, NC and surrounding areas

In business since 2009

Free estimates

Credit card accepted

"The guys did a good job of explaining the possible issues. They chose an option that likely would solve the problem...they implemented the solution and so far everything seems to be going well...no issues since they came.
"
Additional Photos
Additional Photos
Additional Photos
Recommended by91%of homeowners
Avatar for Americas Choice Contractors
Americas Choice Contractors
4.4(
36
)

Serving Lattimore, NC and surrounding areas

In business since 1987

Free estimates

"Except for numerous meetings with Chuck and/or his manager regarding details, the total experience was a plus... from providing estimate to job completion.  We had two bathrooms totally remodeled (one at a time) which took about 3 weeks.  Hallways and adjacent rooms were well protected from dust and debris by Rick and his team as they worked, and complete cleanup was provided at the end of each day... nothing left behind except in the room in which they were working.  My wife and I felt comfortable leaving our home each day to conduct various activities.   Excellent finished project!
"
Recommended by85%of homeowners
...
Showing 1-10 of 55
Basement Remodel questions, answered by experts

Basements with persistent moisture problems or flooding shouldn’t be finished until the moisture issues have been fixed. In addition, if your foundation is cracked, you have unmitigated radon levels, or you have asbestos or lead pipes, remediate the underlying problem before finishing your basement. Turning a basement into living space before fixing these issues can lead to serious health risks or structural damage. 

Basements are commonly converted into game rooms. The potential challenges you may run into include controlling moisture, working with low ceilings, limited natural light, and the need for additional electrical or HVAC work. Addressing these issues can add to the total cost, but it ensures a comfortable and functional space.

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

Egress windows or doors are required in finished basements to meet safety and building codes. If your basement is unfinished and used as a storage space, egress windows are not required, but anything considered a habitable space must have an additional point of egress in addition to the stairs.

Finishing a basement can provide a great return on investment, by increasing the market price of your home when you want to sell. Beyond that, there are many reasons to finish your basement. Doing so expands the usable square footage of your home, so you can enjoy it more, even as your family grows. Renovating your basement costs less in terms of time, energy, and money than having to search for and buy a new home.

The Lattimore, NC homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.