Top-rated basement remodelers.

Get matched with top basement remodelers in Cherryville, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Cherryville, NC?

Select your specific project to find the pro for you.

Find Basement remodelers in Cherryville

Dynamic Services
4.2(
89
)

Serving Cherryville, NC and surrounding areas

In business since 2010

Free estimates

Emergency services offered

"I called him on Friday and he came to my house on the following Monday. I showed him what I needed done and he agreed to come back on Thursday to do the work. He was unable to get back on Thursday but he did get there Friday. He did the work that I needed done .I was happy with the work on the trees and he did clean up. I would hire again in needed. His price was good as well as his work.
"
Recommended by88%of homeowners
Avatar for MI Electric
MI Electric
4.7(
177
)

Serving Cherryville, NC and surrounding areas

In business since 2009

Free estimates

Credit card accepted

"Good experience!! Very nice to work with. Mark showed up on time, put on shoe covers prior to walking on my floors!!Reasonably priced!! I had a problem with the Dimmer Switch several weeks later and Mark came right out and replaced it. No Hassels. I will use him again in the future and highly recommend him!!
"
Additional Photos
Additional Photos
Additional Photos
Recommended by91%of homeowners
Avatar for Aybar Painting
Aybar Painting
5.0(
8
)

Serving Cherryville, NC and surrounding areas

In business since 2002

Free estimates

Credit card accepted

"I found Mr. Aybar and his team to be very friendly and engaging. They were trustworthy, and I had no problem with them being in my home when I was not there.

Their work was excellent, and was reasonably priced.

I have since engaged Mr. Aybar to provide some quotes for some additional remodeling work for my home and would not hesitate to engage him or his team again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+23

Recommended by100%of homeowners
Avatar for Americas Choice Contractors
Americas Choice Contractors
4.4(
36
)

Serving Cherryville, NC and surrounding areas

In business since 1987

Free estimates

"Except for numerous meetings with Chuck and/or his manager regarding details, the total experience was a plus... from providing estimate to job completion.  We had two bathrooms totally remodeled (one at a time) which took about 3 weeks.  Hallways and adjacent rooms were well protected from dust and debris by Rick and his team as they worked, and complete cleanup was provided at the end of each day... nothing left behind except in the room in which they were working.  My wife and I felt comfortable leaving our home each day to conduct various activities.   Excellent finished project!
"
Recommended by85%of homeowners
Avatar for Unified By Design Inc
Unified By Design Inc
4.4(
19
)

Serving Cherryville, NC and surrounding areas

In business since 1998

Free estimates

Credit card accepted

"WORK PRODUCT WAS EXCELLANT AND CRAFTSMANSHIP WAS SUPERB. WORK AREA ALWAYS KEPT CLEAN AND TIDY AT END OF EVERY DAY. ALL CONCERNS WERE ADDRESSED IMMEDIATELY AND RESOLVED SATISFACTORLY."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+21

Recommended by93%of homeowners
...
Showing 1-10 of 75
Basement Remodel questions, answered by experts

Basements with persistent moisture problems or flooding shouldn’t be finished until the moisture issues have been fixed. In addition, if your foundation is cracked, you have unmitigated radon levels, or you have asbestos or lead pipes, remediate the underlying problem before finishing your basement. Turning a basement into living space before fixing these issues can lead to serious health risks or structural damage. 

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Kitchens and bathrooms are typically the most expensive rooms to renovate. The high cost is due to several factors, including expensive appliances like ranges, hoods, and refrigerators, as well as costly fixtures. The 'bones' of the room, such as electrical and plumbing, are also expensive to move or replace. Because of the vast amount of prep work, finishing, and specialized labor involved in a relatively small footprint, these projects can cost double or more than a living space remodel. Even when trying to renovate on a budget, kitchens and bathrooms will likely carry a hefty price tag.

Envision the type of bar experience you'd like to create for your guests. For example:

  • Does your basement have enough finished space for bar stools or seating?

  • What type of additional lighting would set the tone for the room?

  • Are there basement windows or an HVAC system?

  • Do you need new plumbing in your basement for a proper wet bar?

  • Could you be happy with a built-in wall cabinet bar rather than a full-scale wet bar?

Making a window in a basement larger costs an average of $4,200. You’ll need to pay an average of $550 to have a structural engineer plan the project, $500 to $1,500 for the installation labor, and an average of $2,200 for the excavation and window well installation. The remainder will go toward pulling permits, installing trim, and repairing drywall on the interior.

The Cherryville, NC homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.